Print Report | Back to Sample Detail

Sample Record for 2019-06-20-3

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 211848 DEA: 112T2174 EFIS: 1116000131 QA Service Level: 1
DIST-CO-RTE-PM: 11-SD-5-R37.4 - R46.5
Work Description: (Alternative Delivery) CMGC, San Elijo Highway Bridge Replacement. Replace the San Elijo lagoon highway bridge, construct HOV lanes, construct bike and pedestrian trails and bridge, build multi-use facility at Manchester Ave.
Location Description: IN SAN DIEGO COUNTY IN SOLANA BEACH AND ENCINITAS FROM 0.1 MILE NORTH OF LOMAS SANTA FE DRIVE OVERCROSSING TO 0.2 MILE SOUTH OF BIRMINGHAM DRIVE OVERCROSSING
Contractor Name: Flatiron-Skanska-Stacy and Witbeck, a Joint Venture
Contractor Address: 1770 La Costa Meadows Drive, San Marcos, CA 92078
Resident Engineer: Steve McMillan Structure Rep.: Phong Le

Sample Information

DIME Sample ID: 2019-06-20-3
TL Number from the TL Form:
Sample Submitted By Organization: CT HQ - QASI Los Angeles Field Office
Sample Organization Contact: (858) 285-5797
Type of Sample: Quality Assurance
Type of Material: SMTL TM5 - Couplers
Sample Taken Date: 06/20/2019
Date that the sample was received by the laboratory/organization performing the testing: 06/25/2019
The quantity of what the sample constitutes: 12
A brief description of the sample: #6 Lenton Threaded Bar Model A2
From where was the sample collected: Fabricator
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: CMC San Bernardino

Material Information

Production or Authorization Testing: Production Testing
Service or Ultimate: Ultimate
Material Standard Code: ASTM A706
Material Grade: 60
Rebar Manufacturer: CMC
Coupler Manufacturer: Erico Lenton
Intermediate Assembler or Fabricator:
Rebar Size: 6
Coupler Model: Standard A2
Coating Standards: Uncoated
Shape of Rebar: Straight
Rebar Hoop Diameter:
Rebar Hoop Fabricator:
Coupler Component Heat/Lot Number(s): L9460, l9396, LA980
Rebar Heat Number(s): 4084567, 9000029
Rebar Size 2 :
Coupler Unique ID:

Test Results

Test 1 of 6

DIME Test ID: 2019-06-20-3-1
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 07/02/2019
Date Tested: 07/01/2019
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Slip (inch)Peak Load (lbf)Peak Stress (psi)CommentsTested By
11#6/19mm0.44-0.00224077292664Service SpliceBrian
Temperature 72 F
UTM 400KIP
Halo ID Small

Test 2 of 6

DIME Test ID: 2019-06-20-3-2
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 07/02/2019
Date Tested: 07/01/2019
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Slip (inch)Peak Load (lbf)Peak Stress (psi)CommentsTested By
21#6/19mm0.4404023991452Service SpliceBrian
Temperature 72 F
UTM 400KIP
Halo ID Small

Test 3 of 6

DIME Test ID: 2019-06-20-3-3
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 07/02/2019
Date Tested: 07/01/2019
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Slip (inch)Peak Load (lbf)Peak Stress (psi)CommentsTested By
31#6/19mm0.4404124093727Service SpliceBrian
Temperature 72 F
UTM 400KIP
Halo ID Small

Test 4 of 6

DIME Test ID: 2019-06-20-3-4
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 07/02/2019
Date Tested: 07/01/2019
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Slip (inch)Peak Load (lbf)Peak Stress (psi)CommentsTested By
12#6/19mm0.44-0.00283936689468Service SpliceBrian
Temperature 72 F
UTM 400KIP
Halo ID Small

Test 5 of 6

DIME Test ID: 2019-06-20-3-5
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 07/02/2019
Date Tested: 07/01/2019
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Slip (inch)Peak Load (lbf)Peak Stress (psi)CommentsTested By
22#6/19mm0.4404233196207Service SpliceBrian
Temperature 72 F
UTM 400KIP
Halo ID Small

Test 6 of 6

DIME Test ID: 2019-06-20-3-6
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 07/02/2019
Date Tested: 07/01/2019
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Slip (inch)Peak Load (lbf)Peak Stress (psi)CommentsTested By
32#6/19mm0.4404182995066Service SpliceBrian
Temperature 72 F
UTM 400KIP
Halo ID Small