Sample Record for 2019-06-10-12
Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project Information
Project ID: 209695 DEA: 08347704 EFIS: 0800000616
QA Service Level: 1
DIST-CO-RTE-PM: 08-SBD-SR-58-0/12.9
Work Description: (Alternative Delivery) The CMGC project will upgrade SR 58 from 2- to 4-lanes in San Bernardino County from the Kern County line to 7.5 miles east of US-395.
Location Description: SR-58 / 395 Kramer Junction project. In San Bernardino County from the Kern County line to 7.5 miles east of US-395.
Contractor Name: KIEWIT INFRASTRUCTURE WEST CO.
Contractor Address: 2215 E 1ST STREET, VANCOUVER, WA 98661
Resident Engineer: Shaine Shahidi Structure Rep.: Osama Abdalla
Sample Information
DIME Sample ID: 2019-06-10-12
TL Number from the TL Form: C706077
Sample Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Sample Organization Contact: (530) 329-6527
Type of Sample: Quality Assurance
Type of Material: SMTL TM5 - Couplers
Sample Taken Date: 06/10/2019
Date that the sample was received by the laboratory/organization performing the testing: 06/20/2019
The quantity of what the sample constitutes: 12
A brief description of the sample: Lenton Couplers
From where was the sample collected: Fabricator
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: CMC Rebar
Material Information
Production or Authorization Testing: Production Testing
Service or Ultimate: Service
Material Standard Code: ASTM A706
Material Grade: 60
Rebar Manufacturer: CMC
Coupler Manufacturer: Erico
Intermediate Assembler or Fabricator: Unknown
Rebar Size: 11
Coupler Model: Lenton A2
Coating Standards: Uncoated
Shape of Rebar: Straight
Rebar Hoop Diameter: Unknown
Rebar Hoop Fabricator: Unknown
Coupler Component Heat/Lot Number(s): L9491
Rebar Heat Number(s): 9000772
Rebar Size 2 :
Coupler Unique ID:
Test Results
Test 1 of 9
DIME Test ID: 2019-06-10-12-1
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 06/20/2019
Date Tested: 06/20/2019
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 3 | 1 | No. 11/36mm | 1.56 | 0 | 148385 | 95118 | Service Splice | bewing |
| |
Temperature
|
72.00 f
|
UTM
|
2000kip
|
Halo ID
|
Small
|
Test 2 of 9
DIME Test ID: 2019-06-10-12-2
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 06/20/2019
Date Tested: 06/20/2019
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 6 | 1 | No. 11/36mm | 1.56 | 0 | 156332 | 100213 | Service Splice | bewing |
| |
Temperature
|
72.00 f
|
UTM
|
2000kip
|
Halo ID
|
Small
|
Test 3 of 9
DIME Test ID: 2019-06-10-12-3
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 06/20/2019
Date Tested: 06/20/2019
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 7 | 1 | No. 11/36mm | 1.56 | -0.00165 | 155856 | 99908 | Service Splice | bewing |
| |
Temperature
|
72.00 f
|
UTM
|
2000kip
|
Halo ID
|
Small
|
Test 4 of 9
DIME Test ID: 2019-06-10-12-4
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 06/20/2019
Date Tested: 06/20/2019
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 2 | 1 | No. 11/36mm | 1.56 | 0 | 144459 | 92602 | Service Splice | bewing |
| |
Temperature
|
72.00 f
|
UTM
|
2000kip
|
Halo ID
|
Small
|
Test 5 of 9
DIME Test ID: 2019-06-10-12-5
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 06/20/2019
Date Tested: 06/20/2019
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 1 | 1 | No. 11/36mm | 1.56 | 0.00145 | 149433 | 95791 | Service Splice | bewing |
| |
Temperature
|
72.00 f
|
UTM
|
2000kip
|
Halo ID
|
Small
|
Test 6 of 9
DIME Test ID: 2019-06-10-12-6
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 06/20/2019
Date Tested: 06/20/2019
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 4 | 1 | No. 11/36mm | 1.56 | 0.00135 | 129844 | 83233 | Service Splice | bewing |
| |
Temperature
|
72.00 f
|
UTM
|
2000kip
|
Halo ID
|
Small
|
Test 7 of 9
DIME Test ID: 2019-06-10-12-7
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 06/20/2019
Date Tested: 06/20/2019
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 5 | 1 | No. 11/36mm | 1.56 | 0 | 153305 | 98272 | Service Splice | bewing |
| |
Temperature
|
72.00 f
|
UTM
|
2000kip
|
Halo ID
|
Small
|
Test 8 of 9
DIME Test ID: 2019-06-10-12-8
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 06/20/2019
Date Tested: 06/20/2019
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 8 | 1 | No. 11/36mm | 1.56 | 0 | 155212 | 99495 | Service Splice | bewing |
| |
Temperature
|
72.00 f
|
UTM
|
2000kip
|
Halo ID
|
Small
|
Test 9 of 9
DIME Test ID: 2019-06-10-12-9
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 06/20/2019
Date Tested: 06/20/2019
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 9 | 1 | No. 11/36mm | 1.56 | 0 | 147102 | 94296 | Service Splice | bewing |
| |
Temperature
|
72.00 f
|
UTM
|
2000kip
|
Halo ID
|
Small
|