Print Report | Back to Sample Detail

Sample Record for 2019-05-28-6

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 209695 DEA: 08347704 EFIS: 0800000616 QA Service Level: 1
DIST-CO-RTE-PM: 08-SBD-SR-58-0/12.9
Work Description: (Alternative Delivery) The CMGC project will upgrade SR 58 from 2- to 4-lanes in San Bernardino County from the Kern County line to 7.5 miles east of US-395.
Location Description: SR-58 / 395 Kramer Junction project. In San Bernardino County from the Kern County line to 7.5 miles east of US-395.
Contractor Name: KIEWIT INFRASTRUCTURE WEST CO.
Contractor Address: 2215 E 1ST STREET, VANCOUVER, WA 98661
Resident Engineer: Shaine Shahidi Structure Rep.: Osama Abdalla

Sample Information

DIME Sample ID: 2019-05-28-6
TL Number from the TL Form: 20190528
Sample Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Sample Organization Contact: 213-792-4794
Type of Sample: Quality Assurance
Type of Material: Concrete
Sample Taken Date: 05/28/2019
Date that the sample was received by the laboratory/organization performing the testing: 05/29/2019
The quantity of what the sample constitutes: 2
A brief description of the sample: 6x12 concrete cylinders
From where was the sample collected: Job Site
Laboratory sample identification: 976-20190528
Structure unique identifier:
Structure name: BR 54 1326R Abut 1R ,RW
The fabricator/manufacturer/facility name: Robertsons LUCERNE

Material Information

The concrete mix design number: SC675B38
The truck number from where the sample was collected: 1700
The batch plant ticket number from where the sample was collected: 6097611
Concrete batch plant: Unknown
The fabricator/manufacturer designation for the sample: SECURITY PAVING
A detailed description of where the material sample was collected: BR 54 1326R Abut 1R RW
Where the material sample would have been placed if not sampled: BR 54 13226R Abut 1R RW
From Lot No.: Unknown
Bag Lot No.: Unknown

Test Results

Test 1 of 1

DIME Test ID: 2019-05-28-6-1
Test Method: ASTM C39-10: Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens
Capped in accordance with ASTM C617/CTM521
Cured in accordance with ASTM C511
Verified Date: 06/26/2019
Date Tested: 06/25/2019
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
Unit system used? US Units
Number of specimens 2
Test performed With no density determined
Cross sectional area of cylinder 1 28.27 in^2
Cross sectional area of cylinder 2 28.27 in^2
Capped in accordance with? ASTM C617/CTM521
Compressive strength (to nearest 10 psi) 5790 psi
Average diameter of cylinder 1 6.00 in
Average diameter of cylinder 2 6.00 in
Compressive strength of cylinder 1 5746.4 psi
Compressive strength of cylinder 2 5828.1 psi
Maximum load on cylinder 1 162450 lb
Maximum load on cylinder 2 164760 lb
Type of fracture pattern of cylinder 1 1
Type of fracture pattern of cylinder 2 1
Comment on any defect in either specimen or caps (Max 250 Characters) no data
Correction factor for cylinder 1 1
Correction factor for cylinder 2 1
Age of specimen 28 days