Sample Record for 2019-02-08-5
Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project Information
Project ID: 211784 DEA: 11085784 EFIS: 1100000064
QA Service Level: 1
DIST-CO-RTE-PM: 11-SD-163-4.1/4.9
Work Description: INTERCHANGE MODIFICATION AND OVERCROSSING WIDENING.
Location Description: SAN DIEGO COUNTY IN SAN DIEGO FROM 0.3 MILE SOUTH TO 0.5 MILE NORTH OF FRIARS ROAD OVERCROSSING
Contractor Name: Flatiron West Inc
Contractor Address: 1770 La Costa Meadows Dr., San Marcos, CA 92078
Resident Engineer: Dave Cortez Structure Rep.: Alex Balce
Sample Information
DIME Sample ID: 2019-02-08-5
TL Number from the TL Form: C958037
Sample Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Sample Organization Contact: (530) 329-6527
Type of Sample: Quality Assurance
Type of Material: SMTL TM5 - Couplers
Sample Taken Date: 02/08/2019
Date that the sample was received by the laboratory/organization performing the testing: 02/22/2019
The quantity of what the sample constitutes: 4
A brief description of the sample: Lenton Couplers
From where was the sample collected: Job Site
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Flatiron CMC
Material Information
Production or Authorization Testing: Production Testing
Service or Ultimate: Service
Material Standard Code: ASTM A706
Material Grade: 60
Rebar Manufacturer: CMC
Coupler Manufacturer: Erico Lenton
Intermediate Assembler or Fabricator: Unknown
Rebar Size: 9
Coupler Model: Erico Lenton
Coating Standards: Uncoated
Shape of Rebar: Straight
Rebar Hoop Diameter: Unknown
Rebar Hoop Fabricator: Unknown
Coupler Component Heat/Lot Number(s): L9140
Rebar Heat Number(s): 4081659 4079223
Rebar Size 2 :
Coupler Unique ID:
Test Results
Test 1 of 4
DIME Test ID: 2019-02-08-5-1
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 03/04/2019
Date Tested: 02/22/2019
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 1 | 1 | #9/29mm | 1 | -0.0059 | 79667 | 79667 | Service Splice | Brian |
| |
Temperature
|
72 F
|
UTM
|
400KIP
|
Halo ID
|
Small
|
Test 2 of 4
DIME Test ID: 2019-02-08-5-2
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 03/04/2019
Date Tested: 02/22/2019
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 2 | 1 | #9/29mm | 1 | 0 | 84325 | 84325 | Service Splice | Brian |
| |
Temperature
|
72 F
|
UTM
|
400KIP
|
Halo ID
|
Small
|
Test 3 of 4
DIME Test ID: 2019-02-08-5-3
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 03/04/2019
Date Tested: 02/22/2019
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 3 | 1 | #9/29mm | 1 | 0 | 86053 | 86053 | Service Splice | Brian |
| |
Temperature
|
72 F
|
UTM
|
400KIP
|
Halo ID
|
Small
|
Test 4 of 4
DIME Test ID: 2019-02-08-5-4
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 03/04/2019
Date Tested: 02/22/2019
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 4 | 1 | #9/29mm | 1 | 0 | 85939 | 85939 | Service Splice | Brian |
| |
Temperature
|
72 F
|
UTM
|
400KIP
|
Halo ID
|
Small
|