Sample Record for 2019-01-25-1
Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project Information
Project ID: 213822 DEA: 010J4404 EFIS: 0119000039
QA Service Level: 1
DIST-CO-RTE-PM: 01-HUM-200,299-R2.66
Work Description: REPAIR STRUCTURE - BRIDGE DECK GIRDER REPAIR
Location Description:
Contractor Name: Golden State Bridge
Contractor Address: 3701 Mallard Drive, Benicia, CA 94510
Resident Engineer: Brian Winter Structure Rep.: Mike McCracken
Sample Information
DIME Sample ID: 2019-01-25-1
TL Number from the TL Form: C
Sample Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Sample Organization Contact: (530) 329-6527
Type of Sample: Quality Assurance
Type of Material: SMTL TM5 - Couplers
Sample Taken Date: 01/25/2019
Date that the sample was received by the laboratory/organization performing the testing: 01/25/2019
The quantity of what the sample constitutes: 4
A brief description of the sample: Dayton Bar lock couplers
From where was the sample collected: Job Site
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Nucor Dayton Superior
Material Information
Production or Authorization Testing: Production Testing
Service or Ultimate: Service
Material Standard Code: ASTM A706
Material Grade: 40
Rebar Manufacturer: Nucor
Coupler Manufacturer: Dayton Superior
Intermediate Assembler or Fabricator: Unknown
Rebar Size: 11
Coupler Model: Bar-Lock Standard Couplers
Coating Standards: ASTM A775 epoxy
Shape of Rebar: Straight
Rebar Hoop Diameter: Unknown
Rebar Hoop Fabricator: Unknown
Coupler Component Heat/Lot Number(s): 154910, 74105869
Rebar Heat Number(s): PL17109315
Rebar Size 2 :
Coupler Unique ID:
Test Results
Test 1 of 4
DIME Test ID: 2019-01-25-1-1
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 01/25/2019
Date Tested: 01/25/2019
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 1 | C02 | #11/36mm | 1.56 | -0.0035 | 112402 | 72053 | Service Splice | Brian |
| |
Temperature
|
72 F
|
UTM
|
2000KIP
|
Halo ID
|
Big
|
Test 2 of 4
DIME Test ID: 2019-01-25-1-2
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 01/25/2019
Date Tested: 01/25/2019
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 2 | C02 | #11/36mm | 1.56 | 0 | 110975 | 71138 | Service Splice | Brian |
| |
Temperature
|
72 F
|
UTM
|
2000KIP
|
Halo ID
|
Big
|
Test 3 of 4
DIME Test ID: 2019-01-25-1-3
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 01/25/2019
Date Tested: 01/25/2019
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 3 | C02 | #11/36mm | 1.56 | 0 | 110266 | 70683 | Service Splice | Brian |
| |
Temperature
|
72 F
|
UTM
|
2000KIP
|
Halo ID
|
Big
|
Test 4 of 4
DIME Test ID: 2019-01-25-1-4
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 01/25/2019
Date Tested: 01/25/2019
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 4 | C02 | #11/36mm | 1.56 | 0 | 111145 | 71247 | Service Splice | Brian |
| |
Temperature
|
72 F
|
UTM
|
2000KIP
|
Halo ID
|
Big
|