Sample Record for 2018-02-23-9
Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project Information
Project ID: 211260 DEA: 072159U4 EFIS: 0715000160
QA Service Level: 1
DIST-CO-RTE-PM: 07-LA,ORA-5-0.0/1.5, 44.3/44.4
Work Description: CONSTRUCT HOV LANES AND MIX FLOW LANES.
Location Description: LOS ANGELES AND ORANGE COUNTIES IN BUENA PARK, LA MIRADA, CERRITOS AND SANTA FE SPRINGS FROM ARTESIA BOULEVARD UNDERCROSSING TO NORTH FORK COYOTE CREEK
Contractor Name: SECURITY PAVING COMPANY, INC.
Contractor Address: 3075 TOWNSGATE RD. SUITE 200, WESTLAKE VILLAGE, CA 91361
Resident Engineer: George Saker Structure Rep.: Danny Lalonde
Sample Information
DIME Sample ID: 2018-02-23-9
TL Number from the TL Form: Unknown
Sample Submitted By Organization: G3 Quality, Incorporated - Cerritos
Sample Organization Contact: (562) 321-9840
Type of Sample: Quality Control
Type of Material: Concrete
Sample Taken Date: 02/23/2018
Date that the sample was received by the laboratory/organization performing the testing: 02/24/2018
The quantity of what the sample constitutes: 6
A brief description of the sample: 6x12 Cylinders
From where was the sample collected: Job Site
Laboratory sample identification: Set 1
Structure unique identifier: Unknown
Structure name: Unknown
The fabricator/manufacturer/facility name: Jobsite
Material Information
The concrete mix design number: S62578
The truck number from where the sample was collected: Load 3
The batch plant ticket number from where the sample was collected: 212861
Concrete batch plant: Unknown
The fabricator/manufacturer designation for the sample: Set 1
A detailed description of where the material sample was collected: RW 52 Footing
Where the material sample would have been placed if not sampled: Unknown
From Lot No.: Unknown
Bag Lot No.: Unknown
Test Results
Test 1 of 4
DIME Test ID: 2018-02-23-9-1
Test Method: CTM 521-November 2014: Method of Test for Compressive Strength of Molded Concrete Cylinders
Verified Date: 11/06/2018
Date Tested: 03/02/2018
Submitted By Organization: G3 Quality, Incorporated - Cerritos
Organization Address: 13850 Cerritos Corporate Drive, Unit E,
Organization City: Cerritos
Organization State: CA
Organization Zipcode: 90703
Organization Email: hwalker@g3quality.com
Organization Phone: 562-321-9853
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
Cross sectional area of cylinder 1
|
28.37 in^2
|
Cross sectional area of cylinder 2
|
28.37 in^2
|
Compressive strength (to nearest 10 psi)
|
3220 psi
|
Comment on any defect in either specimen or caps (Max 250 Characters)
|
no data
|
Correction factor for cylinder 1
|
1
|
Age of specimen
|
7 days
|
Test 2 of 4
DIME Test ID: 2018-02-23-9-2
Test Method: CTM 521-November 2014: Method of Test for Compressive Strength of Molded Concrete Cylinders
Verified Date: 11/06/2018
Date Tested: 03/23/2018
Submitted By Organization: G3 Quality, Incorporated - Cerritos
Organization Address: 13850 Cerritos Corporate Drive, Unit E,
Organization City: Cerritos
Organization State: CA
Organization Zipcode: 90703
Organization Email: hwalker@g3quality.com
Organization Phone: 562-321-9853
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
Cross sectional area of cylinder 1
|
28.37 in^2
|
Cross sectional area of cylinder 2
|
28.37 in^2
|
Compressive strength (to nearest 10 psi)
|
4640 psi
|
Comment on any defect in either specimen or caps (Max 250 Characters)
|
no data
|
Correction factor for cylinder 1
|
1
|
Age of specimen
|
28 days
|
Test 3 of 4
DIME Test ID: 2018-02-23-9-3
Test Method: CTM 557-July 2012: Method of Test for Temperature of Freshly Mixed Portland Cement Concrete
Verified Date: 11/06/2018
Date Tested: 02/23/2018
Submitted By Organization: G3 Quality, Incorporated - Cerritos
Organization Address: 13850 Cerritos Corporate Drive, Unit E,
Organization City: Cerritos
Organization State: CA
Organization Zipcode: 90703
Organization Email: hwalker@g3quality.com
Organization Phone: 562-321-9853
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
Temperature of the freshly mixed concrete
|
58 F
|
Test 4 of 4
DIME Test ID: 2018-02-23-9-4
Test Method: CTM 556-January 2018: Method of Test for Slump of Fresh Portland Cement Concrete
Verified Date: 11/06/2018
Date Tested: 02/23/2018
Submitted By Organization: G3 Quality, Incorporated - Cerritos
Organization Address: 13850 Cerritos Corporate Drive, Unit E,
Organization City: Cerritos
Organization State: CA
Organization Zipcode: 90703
Organization Email: hwalker@g3quality.com
Organization Phone: 562-321-9853
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified: