Print Report | Back to Sample Detail

Sample Record for 2018-08-07-11

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 209141 DEA: 07215954 EFIS: 0700001835 QA Service Level: 1
DIST-CO-RTE-PM: 07-LA-5-0.0/7.6
Work Description: WIDENING FREEWAY AND RECONSTRUCT OVERHEAD AND OVERCROSSING STRUCTURES
Location Description: LOS ANGELES COUNTY IN LA MIRADA, SANTA FE SPRINGS, NORWALK AND DOWNEY FROM ORANGE COUNTY/LOS ANGELES COUNTY LIMIT LINES TO 0.7 MILE NORTH OF ROUTE 605
Contractor Name: SECURITY PAVING COMPANY, INC.
Contractor Address: 13170 TELFAIR AVENUE, SYLMAR, CA 91342
Resident Engineer: Thang Ton Structure Rep.: Amare Tsagie

Sample Information

DIME Sample ID: 2018-08-07-11
TL Number from the TL Form: Unknown
Sample Submitted By Organization: G3 Quality, Incorporated - Cerritos
Sample Organization Contact: (562) 321-9840
Type of Sample: Quality Control
Type of Material: Concrete
Sample Taken Date: 08/07/2018
Date that the sample was received by the laboratory/organization performing the testing: 08/08/2018
The quantity of what the sample constitutes: 6
A brief description of the sample: 6x12 concrete cylinders
From where was the sample collected: Job Site
Laboratory sample identification: Set 1
Structure unique identifier: Unknown
Structure name: Unknown
The fabricator/manufacturer/facility name: Jobsite

Material Information

The concrete mix design number: S70113
The truck number from where the sample was collected: Truck 461 Load 1
The batch plant ticket number from where the sample was collected: 222274
Concrete batch plant: Unknown
The fabricator/manufacturer designation for the sample: Set 1
A detailed description of where the material sample was collected: RW 103
Where the material sample would have been placed if not sampled: 0
From Lot No.: Unknown
Bag Lot No.: Unknown

Test Results

Test 1 of 6

DIME Test ID: 2018-08-07-11-1
Test Method: CTM 521-November 2014: Method of Test for Compressive Strength of Molded Concrete Cylinders
Verified Date: 11/06/2018
Date Tested: 08/14/2018
Submitted By Organization: G3 Quality, Incorporated - Cerritos
Organization Address: 13850 Cerritos Corporate Drive, Unit E,
Organization City: Cerritos
Organization State: CA
Organization Zipcode: 90703
Organization Email: hwalker@g3quality.com
Organization Phone: 562-321-9853
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
Cross sectional area of cylinder 1 28.37 in^2
Cross sectional area of cylinder 2 28.37 in^2
Compressive strength (to nearest 10 psi) 3620 psi
Comment on any defect in either specimen or caps (Max 250 Characters) no data
Correction factor for cylinder 1 1
Age of specimen 7 days

Test 2 of 6

DIME Test ID: 2018-08-07-11-2
Test Method: CTM 521-November 2014: Method of Test for Compressive Strength of Molded Concrete Cylinders
Verified Date: 11/06/2018
Date Tested: 09/04/2018
Submitted By Organization: G3 Quality, Incorporated - Cerritos
Organization Address: 13850 Cerritos Corporate Drive, Unit E,
Organization City: Cerritos
Organization State: CA
Organization Zipcode: 90703
Organization Email: hwalker@g3quality.com
Organization Phone: 562-321-9853
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
Cross sectional area of cylinder 1 28.37 in^2
Cross sectional area of cylinder 2 28.37 in^2
Compressive strength (to nearest 10 psi) 5460 psi
Comment on any defect in either specimen or caps (Max 250 Characters) no data
Correction factor for cylinder 1 1
Age of specimen 28 days

Test 3 of 6

DIME Test ID: 2018-08-07-11-3
Test Method: CTM 557-July 2012: Method of Test for Temperature of Freshly Mixed Portland Cement Concrete
Verified Date: 11/06/2018
Date Tested: 08/07/2018
Submitted By Organization: G3 Quality, Incorporated - Cerritos
Organization Address: 13850 Cerritos Corporate Drive, Unit E,
Organization City: Cerritos
Organization State: CA
Organization Zipcode: 90703
Organization Email: hwalker@g3quality.com
Organization Phone: 562-321-9853
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
Temperature of the freshly mixed concrete 97 F

Test 4 of 6

DIME Test ID: 2018-08-07-11-4
Test Method: CTM 518-June 2010: Method of Test for Unit Weight of Fresh Concrete
Verified Date: 11/06/2018
Date Tested: 08/07/2018
Submitted By Organization: G3 Quality, Incorporated - Cerritos
Organization Address: 13850 Cerritos Corporate Drive, Unit E,
Organization City: Cerritos
Organization State: CA
Organization Zipcode: 90703
Organization Email: hwalker@g3quality.com
Organization Phone: 562-321-9853
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
Unit weight of the concrete 146.9 lb/ft^3
Cement content no data

Test 5 of 6

DIME Test ID: 2018-08-07-11-5
Test Method: CTM 504-June 2010: Method of Test for Determining Air Content of Freshly Mixed Concrete by the Pressure Method
Verified Date: 11/06/2018
Date Tested: 08/07/2018
Submitted By Organization: G3 Quality, Incorporated - Cerritos
Organization Address: 13850 Cerritos Corporate Drive, Unit E,
Organization City: Cerritos
Organization State: CA
Organization Zipcode: 90703
Organization Email: hwalker@g3quality.com
Organization Phone: 562-321-9853
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
Air Content 2 %

Test 6 of 6

DIME Test ID: 2018-08-07-11-6
Test Method: CTM 533-June 2010: Method of Test for Ball Penetration in Fresh Portland Cement Concrete
Verified Date: 11/06/2018
Date Tested: 08/07/2018
Submitted By Organization: G3 Quality, Incorporated - Cerritos
Organization Address: 13850 Cerritos Corporate Drive, Unit E,
Organization City: Cerritos
Organization State: CA
Organization Zipcode: 90703
Organization Email: hwalker@g3quality.com
Organization Phone: 562-321-9853
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
Ball penetration in freshly mixed concrete (average) 3.25 inch