Print Report | Back to Sample Detail

Sample Record for 2018-10-24-2

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

DEA: No Project QA Service Level:
DIST-CO-RTE-PM: ---
Work Description: Special project identifier for material not associated with a project
Location Description:
Contractor Name: Unknown
Contractor Address: Unknown
Resident Engineer: Unknown Structure Rep.: Unknown

Sample Information

DIME Sample ID: 2018-10-24-2
TL Number from the TL Form: Unknown
Sample Submitted By Organization: CT HQ - QASI Los Angeles Field Office
Sample Organization Contact: (858) 285-5797
Type of Sample: Recertification
Type of Material: SMTL TM5 - Welded Hoops
Sample Taken Date: 10/24/2018
Date that the sample was received by the laboratory/organization performing the testing: 10/24/2018
The quantity of what the sample constitutes: 10
A brief description of the sample: Resistance Butt Welded Hoops
From where was the sample collected: Fabricator
Laboratory sample identification: Unknown
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: RKR Steel Welding

Material Information

Production or Authorization Testing: Production Testing
Service or Ultimate: Ultimate
Rebar Heat Number(s): 65032430
Hoop Manufacturer Lot Number(s): 1
Material Standard Code: ASTM A706
Material Grade: 60
Rebar Size: 8
Diameter of Hoop: 2'-5"
Epoxy Coated: No
Epoxy Coating Color: NA
Rebar Manufacturer: Gerdau
Welding Company: RKR Steel Welding
Coating Standards: Uncoated
Weld Type: Flash Welded

Test Results

Test 1 of 8

DIME Test ID: 2018-10-24-2-1
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical)
Verified Date: 11/30/2018
Date Tested: 11/07/2018
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: NECKING OK
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested 1
SampleNumber of CyclesSizeMfg. Lot Number(s)Area (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
Cycle-1100#8/25mm10.797633596627NECKING OKBrian
UTM 400KIP
Temperature 72 F

Test 2 of 8

DIME Test ID: 2018-10-24-2-2
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical)
Verified Date: 11/30/2018
Date Tested: 11/07/2018
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: NECKING OK
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested 1
SampleNumber of CyclesSizeMfg. Lot Number(s)Area (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
Cycle-2100#8/25mm10.797609996328NECKING OKBrian
UTM 400KIP
Temperature 72 F

Test 3 of 8

DIME Test ID: 2018-10-24-2-3
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical)
Verified Date: 11/30/2018
Date Tested: 11/07/2018
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: NECKING OK
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested 1
SampleNumber of CyclesSizeMfg. Lot Number(s)Area (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
Cycle-3100#8/25mm10.797485894757NECKING OKBrian
UTM 400KIP
Temperature 72 F

Test 4 of 8

DIME Test ID: 2018-10-24-2-4
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical)
Verified Date: 11/30/2018
Date Tested: 11/07/2018
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: NECKING OK
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested 1
SampleNumber of CyclesSizeMfg. Lot Number(s)Area (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
Cycle-4100#8/25mm10.797612596361NECKING OKBrian
UTM 400KIP
Temperature 72 F

Test 5 of 8

DIME Test ID: 2018-10-24-2-5
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical)
Verified Date: 11/30/2018
Date Tested: 11/07/2018
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: NECKING OK
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested 1
SampleNumber of CyclesSizeMfg. Lot Number(s)Area (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
Break-1100#8/25mm10.797749798097NECKING OKBrian
UTM 400KIP
Temperature 72 F

Test 6 of 8

DIME Test ID: 2018-10-24-2-6
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical)
Verified Date: 11/30/2018
Date Tested: 11/07/2018
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: NECKING OK
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested 1
SampleNumber of CyclesSizeMfg. Lot Number(s)Area (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
Break-2100#8/25mm10.797615196394NECKING OKBrian
UTM 400KIP
Temperature 72 F

Test 7 of 8

DIME Test ID: 2018-10-24-2-7
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical)
Verified Date: 11/30/2018
Date Tested: 11/07/2018
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: NECKING OK
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested 1
SampleNumber of CyclesSizeMfg. Lot Number(s)Area (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
Break-3100#8/25mm10.797588396054NECKING OKBrian
UTM 400KIP
Temperature 72 F

Test 8 of 8

DIME Test ID: 2018-10-24-2-8
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical)
Verified Date: 11/30/2018
Date Tested: 11/07/2018
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: NECKING OK
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested 1
SampleNumber of CyclesSizeMfg. Lot Number(s)Area (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
Break-4100#8/25mm10.797511695084NECKING OKBrian
UTM 400KIP
Temperature 72 F