Gavin Newsom, Governor |
DEPARTMENT OF TRANSPORTATIONDIVISION OF ENGINEERING SERVICES MATERIALS ENGINEERING AND TESTING SERVICES Concrete Materials Testing Branch 5900 Folsom Blvd. Sacramento, CA 95819 916-227-7205 |
Contract # 032F5904 Cty YUB Rte 20 PM 20.1/21.7, 0.0/0.1 Vendor # |
REPORT OF LABORATORY TESTING |
||||
Resident Engineer: |
Aaron Chamberlin |
Date Reported: |
09/20/2018 |
|
Address: |
TL Number: |
131156 |
||
City: |
||||
Project Name: CURVE REALIGNMENT AND SHOULDER WIDENING |
||||
Prime Contractor: Flatiron West, Incorporated |
||||
Sample Taken Date: |
08/23/2018 |
Mix Design: |
000000 |
|
Contractor: Unknown |
Location: YUBA AND NEVADA COUNTIES NEAR SMARTSVILLE FROM 0.5 MILE WEST OF MCGANNEY LANE TO MOONEY FLAT ROAD |
|||
Structure unique identifier: Unknown |
||||
Structure name: Unknown |
||||
Location of Pour: Unknown |
The following testing has been tested in accordance with:
ASTM C39-17a : Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens
Capped in accordance with ASTM C617/CTM521
Specimen | Average diameter of cylinder (in) | Cross sectional area of cylinder (in^2) | Maximum load on cylinder (lb) | Compressive strength of cylinder (psi) | Type of fracture pattern of cylinder |
---|---|---|---|---|---|
1 | 6.02 | 28.46 | 142164 | 4995.2 | 1 |
2 | 6.03 | 28.56 | 143265 | 5016.3 | 1 |
DIME Test ID: 2018-08-23-4-1
Number of specimens: 2
Compressive strength (to nearest 10 psi): 5010
Age of specimen: 28 days
Certified By: Ruben Macias
*Subject to final inspection by the Resident Engineer. |
![]() |
TL- Report of Laboratory Testing