Gavin Newsom, Governor |
DEPARTMENT OF TRANSPORTATIONDIVISION OF ENGINEERING SERVICES MATERIALS ENGINEERING AND TESTING SERVICES Concrete Materials Testing Branch 5900 Folsom Blvd. Sacramento, CA 95819 916-227-7205 |
Contract # 031F4004 Cty PLA Rte 80 PM 35.1/38.3 Vendor # |
REPORT OF LABORATORY TESTING |
||||
Resident Engineer: |
Phil Zink |
Date Reported: |
08/27/2018 |
|
Address: |
TL Number: |
204452 |
||
City: |
||||
Project Name: WIDEN EASTBOUND ROADWAY |
||||
Prime Contractor: A. TEICHERT & SON, INC. DBA TEICHERT CONSTRUCTION |
||||
Sample Taken Date: |
08/20/2018 |
Mix Design: |
mix 7265 |
|
Contractor: Unknown |
Location: WIDEN EASTBOUND ROADWAY |
|||
Structure unique identifier: Unknown |
||||
Structure name: Unknown |
||||
Location of Pour: Unknown |
The following testing has been tested in accordance with:
ASTM C39-17a : Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens
Capped in accordance with ASTM C617/CTM521
Specimen | Average diameter of cylinder (in) | Cross sectional area of cylinder (in^2) | Maximum load on cylinder (lb) | Compressive strength of cylinder (psi) | Type of fracture pattern of cylinder |
---|---|---|---|---|---|
1 | 6.01 | 28.37 | 88306 | 3112.7 | 1 |
2 | 6.04 | 28.65 | 91854 | 3206.1 | 1 |
DIME Test ID: 2018-08-20-7-1
Number of specimens: 2
Compressive strength (to nearest 10 psi): 3160
Comment on any defect in either specimen or caps (Max 250 Characters):
Age of specimen: 7 days
Certified By: Mike Mullins
*Subject to final inspection by the Resident Engineer. |
TL- Report of Laboratory Testing