Sample Record for 2018-08-08-2
Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project Information
Project ID: 212687 DEA: 06442544 EFIS: 0612000175
QA Service Level: 1
DIST-CO-RTE-PM: 06-KER-46,5-31.5-33.2
Work Description: CONVERT 2-LANE TO 4-LANE CONVENTIONAL HIGHWAY.
Location Description: KERN COUNTY NEAR LOST HILLS FROM 1.0 MILE EAST OF LOST HILLS ROAD TO 0.7 MILE EAST OF ROUTE 46/5 SEPARATION
Contractor Name: SECURITY PAVING COMPANY, INC.
Contractor Address: 13170 TELFAIR AVENUE, SYLMAR, CA 91342
Resident Engineer: Amarjit Dhaliwal Structure Rep.: Ramandeep Guraya
Sample Information
DIME Sample ID: 2018-08-08-2
TL Number from the TL Form: Unknown
Sample Submitted By Organization: CT HQ - QASI Los Angeles Field Office
Sample Organization Contact: (858) 285-5797
Type of Sample: Retest
Type of Material: SMTL TM5 - Welded Hoops
Sample Taken Date: 08/08/2018
Date that the sample was received by the laboratory/organization performing the testing: 08/08/2018
The quantity of what the sample constitutes: 4
A brief description of the sample: Flash Welded Rebar Hoops
From where was the sample collected: Fabricator
Laboratory sample identification: Unknown
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: TNT Rebar
Material Information
Production or Authorization Testing: Production Testing
Service or Ultimate: Ultimate
Rebar Heat Number(s): 000
Hoop Manufacturer Lot Number(s): 2
Material Standard Code: ASTM A706
Material Grade: 60
Rebar Size: 7
Diameter of Hoop: 3'-8"
Epoxy Coated: No
Epoxy Coating Color: NA
Rebar Manufacturer: Gerdau
Welding Company: TNT Rebar
Coating Standards: Uncoated
Weld Type: Flash Welded
Test Results
Test 1 of 4
DIME Test ID: 2018-08-08-2-1
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 08/15/2018
Date Tested: 08/14/2018
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke; OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 1 | 2 | #7/22mm | 0.6 | 61520 | 102530 | Bar Broke | Brian |
| |
UTM
|
400KIP
|
Temperature
|
72 F
|
Test 2 of 4
DIME Test ID: 2018-08-08-2-2
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 08/15/2018
Date Tested: 08/14/2018
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke; OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 2 | 2 | #7/22mm | 0.6 | 60980 | 101630 | Bar Broke | Brian |
| |
UTM
|
400KIP
|
Temperature
|
72 F
|
Test 3 of 4
DIME Test ID: 2018-08-08-2-3
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 08/15/2018
Date Tested: 08/14/2018
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke; OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 3 | 2 | #7/22mm | 0.6 | 60920 | 101530 | Bar Broke | Brian |
| |
UTM
|
400KIP
|
Temperature
|
72 F
|
Test 4 of 4
DIME Test ID: 2018-08-08-2-4
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 08/15/2018
Date Tested: 08/15/2018
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke; OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 4 | 2 | #7/22mm | 0.6 | 61630 | 102720 | Bar Broke | Brian |
| |
UTM
|
400KIP
|
Temperature
|
72 F
|