Print Report | Back to Sample Detail

Sample Record for 2018-07-25-20

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 3807 DEA: 07121844 EFIS: 0700000117 QA Service Level: 1
DIST-CO-RTE-PM: 07-LA-5-42.8/47.3
Work Description: CONSTRUCT HOV LANES, RETAINING WALLS AND SOUND WALLS.
Location Description: LOS ANGELES COUNTY IN LOS ANGELES, GLENDALE, AND BURBANK FROM ROUTE 5/134 SEPARATION TO MAGNOLIA BOULEVARD OVERCROSSING
Contractor Name: SECURITY PAVING COMPANY, INC.
Contractor Address: 13170 TELFAIR AVENUE, SYLMAR, CA 91342
Resident Engineer: James Shih Structure Rep.: Matthew Remo

Sample Information

DIME Sample ID: 2018-07-25-20
TL Number from the TL Form: C686082-C686085
Sample Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Sample Organization Contact: (530) 329-6527
Type of Sample: Quality Assurance
Type of Material: SMTL TM5 - Couplers
Sample Taken Date: 07/25/2018
Date that the sample was received by the laboratory/organization performing the testing: 08/01/2018
The quantity of what the sample constitutes: 16
A brief description of the sample: 6 / 5 Transition Couplers
From where was the sample collected: Manufacturer
Laboratory sample identification: Unknown
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Gerdau BarSplce

Material Information

Production or Authorization Testing: Authorization Testing
Service or Ultimate: Service
Material Standard Code: ASTM A706
Material Grade: 60
Rebar Manufacturer: Gerdau
Coupler Manufacturer: BarSplice Transition
Intermediate Assembler or Fabricator: Unknown
Rebar Size: 5
Coupler Model: Zap Screwlock
Coating Standards: Uncoated
Shape of Rebar: Straight
Rebar Hoop Diameter: Unknown
Rebar Hoop Fabricator: Unknown
Coupler Component Heat/Lot Number(s): 11200, 01031
Rebar Heat Number(s): 65028194, 65030357
Rebar Size 2 : 6
Coupler Unique ID:

Test Results

Test 1 of 12

DIME Test ID: 2018-07-25-20-1
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 08/07/2018
Date Tested: 08/07/2018
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke; OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
11#5/16mm0.312927094420Bar BrokeBrian
UTM 400KIP
Temperature 72 F

Test 2 of 12

DIME Test ID: 2018-07-25-20-2
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 08/07/2018
Date Tested: 08/07/2018
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke; OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
21#5/16mm0.312890093230Bar BrokeBrian
UTM 400KIP
Temperature 72 F

Test 3 of 12

DIME Test ID: 2018-07-25-20-3
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 08/07/2018
Date Tested: 08/07/2018
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke; OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
31#5/16mm0.312925094350Bar BrokeBrian
UTM 400KIP
Temperature 72 F

Test 4 of 12

DIME Test ID: 2018-07-25-20-4
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 08/07/2018
Date Tested: 08/07/2018
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke; OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
12#5/16mm0.312916094060Bar BrokeBrian
UTM 400KIP
Temperature 72 F

Test 5 of 12

DIME Test ID: 2018-07-25-20-5
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 08/07/2018
Date Tested: 08/07/2018
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke; OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
22#5/16mm0.312923094290Bar BrokeBrian
UTM 400KIP
Temperature 72 F

Test 6 of 12

DIME Test ID: 2018-07-25-20-6
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 08/07/2018
Date Tested: 08/07/2018
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke; OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
32#5/16mm0.312900093550Bar BrokeBrian
UTM 400KIP
Temperature 72 F

Test 7 of 12

DIME Test ID: 2018-07-25-20-7
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 08/07/2018
Date Tested: 08/07/2018
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke; OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
13#5/16mm0.312874092710Bar BrokeBrian
UTM 400KIP
Temperature 72 F

Test 8 of 12

DIME Test ID: 2018-07-25-20-8
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 08/07/2018
Date Tested: 08/07/2018
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke; OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
23#5/16mm0.312926094390Bar BrokeBrian
UTM 400KIP
Temperature 72 F

Test 9 of 12

DIME Test ID: 2018-07-25-20-9
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 08/07/2018
Date Tested: 08/07/2018
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke; OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
33#5/16mm0.312917094100Bar BrokeBrian
UTM 400KIP
Temperature 72 F

Test 10 of 12

DIME Test ID: 2018-07-25-20-10
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 08/07/2018
Date Tested: 08/07/2018
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke; OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
14#5/16mm0.312916094060Bar BrokeBrian
UTM 400KIP
Temperature 72 F

Test 11 of 12

DIME Test ID: 2018-07-25-20-11
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 08/07/2018
Date Tested: 08/07/2018
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke; OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
24#5/16mm0.312892093290Bar BrokeBrian
UTM 400KIP
Temperature 72 F

Test 12 of 12

DIME Test ID: 2018-07-25-20-12
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 08/07/2018
Date Tested: 08/07/2018
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke; OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
34#5/16mm0.312915094030Bar BrokeBrian
UTM 400KIP
Temperature 72 F