Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
DEA: No Project
QA Service Level:
DIST-CO-RTE-PM: ---
Work Description: Special project identifier for material not associated with a project
Location Description:
Contractor Name: Unknown
Contractor Address: Unknown
Resident Engineer: Unknown Structure Rep.: Unknown
DIME Sample ID: 2018-05-14-23
TL Number from the TL Form: NA
Sample Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Sample Organization Contact: (530) 329-6527
Type of Sample: Department Acceptance
Type of Material: SMTL TM5 - Headed Bars
Sample Taken Date: 05/14/2018
Date that the sample was received by the laboratory/organization performing the testing: 05/14/2018
The quantity of what the sample constitutes: 4
A brief description of the sample: End Anchors
From where was the sample collected: Manufacturer
Laboratory sample identification: Unknown
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Erico Lenton Nucor
Production or Authorization Testing: Authorization Testing
Rebar Heat Number(s): SE161032724
Head Manufacturer Lot Number(s): L9254, LA836
Rebar Size: 9
Headed Bar Model Name: Lenton DR14
Size of Head: Full Size - 9x
Head Connection Type: Friction Weld
Head Shape: Circular
Rebar Manufacturer: Nucor
Head Manufacturer: Erico lenton
Head Fabricator: Erico Lenton
Material Standard Code: ASTM A706
Headed Bar Unique ID:
DIME Test ID: 2018-05-14-23-1
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical)
Verified Date: 07/05/2018
Date Tested: 06/27/2018
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: NECKING OK
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested
|
1
|
Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | Cycle-1 | 100 | #9/29mm | F9 - DR14 | 1 | 99407 | 99407 | NECKING OK | Fred |
| |
UTM
|
400KIP
|
Temperature
|
72 F
|
DIME Test ID: 2018-05-14-23-2
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical)
Verified Date: 07/05/2018
Date Tested: 06/27/2018
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: NECKING OK
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested
|
1
|
Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 2 | 100 | #9/29mm | F9 - DR14 | 1 | 99210 | 99210 | NECKING OK | Fred |
| |
UTM
|
400KIP
|
Temperature
|
72 F
|
DIME Test ID: 2018-05-14-23-3
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical)
Verified Date: 07/05/2018
Date Tested: 06/27/2018
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: NECKING OK
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested
|
1
|
Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 3 | 100 | #9/29mm | F9 - DR14 | 1 | 99058 | 99058 | NECKING OK | Fred |
| |
UTM
|
400KIP
|
Temperature
|
72 F
|
DIME Test ID: 2018-05-14-23-4
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical)
Verified Date: 07/05/2018
Date Tested: 06/27/2018
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: NECKING OK
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested
|
1
|
Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 4 | 100 | #9/29mm | F9 - DR14 | 1 | 98756 | 98756 | NECKING OK | Fred |
| |
UTM
|
400KIP
|
Temperature
|
72 F
|