Print Report | Back to Sample Detail

Sample Record for 2018-05-10-5

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 212618 DEA: 044G0564 EFIS: 0417000154 QA Service Level: 1
DIST-CO-RTE-PM: 04-ALA-680-M2.4/M12.4
Work Description: ROADWAY REHAB, BRIDGE REPLACEMENT, RET. WALLS, TOLL SYSTEMS
Location Description: FREMONT AND AT SUNOL FROM MISSION BOULEVARD SEPARATION TO KOOPMAN ROAD UNDERCROSSING
Contractor Name: BAY CITIES PAVING & GRADING, INC.
Contractor Address: 1450 Civic Ct. BLDG B #400, Concord CA, 94520
Resident Engineer: Yannaing Tun Structure Rep.: Jordan Jarosz

Sample Information

DIME Sample ID: 2018-05-10-5
TL Number from the TL Form: C670952
Sample Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Sample Organization Contact: (530) 329-6527
Type of Sample: Quality Assurance
Type of Material: SMTL TM5 - Couplers
Sample Taken Date: 05/10/2018
Date that the sample was received by the laboratory/organization performing the testing: 05/15/2018
The quantity of what the sample constitutes: 200
A brief description of the sample: 11 Bartec Couplers
From where was the sample collected: Fabricator
Laboratory sample identification: Unknown
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Harris Rebar, Nucor

Material Information

Production or Authorization Testing: Production Testing
Service or Ultimate: Ultimate
Material Standard Code: ASTM A706
Material Grade: 60
Rebar Manufacturer: Nucor
Coupler Manufacturer: Dextra America
Intermediate Assembler or Fabricator: Harris Rebar
Rebar Size: 11
Coupler Model: 11 Bartec Coupler
Coating Standards: Uncoated
Shape of Rebar: Straight
Rebar Hoop Diameter: Unknown
Rebar Hoop Fabricator: Unknown
Coupler Component Heat/Lot Number(s): DL17102799
Rebar Heat Number(s): PL17109313, PL17209429
Rebar Size 2 :
Coupler Unique ID:

Test Results

Test 1 of 4

DIME Test ID: 2018-05-10-5-1
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 05/16/2018
Date Tested: 05/15/2018
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Broke in Threads
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Slip (inch)Peak Load (lbf)Peak Stress (psi)CommentsTested By
1C01#11/36mm1.56-0.003514344091951Broke in ThreadsFred
Temperature 72 F
UTM 400KIP
Halo ID Small

Test 2 of 4

DIME Test ID: 2018-05-10-5-2
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 05/16/2018
Date Tested: 05/15/2018
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Broke in Threads
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Slip (inch)Peak Load (lbf)Peak Stress (psi)CommentsTested By
2C01#11/36mm1.56014603093606Broke in ThreadsFred
Temperature 72 F
UTM 400KIP
Halo ID Small

Test 3 of 4

DIME Test ID: 2018-05-10-5-3
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 05/16/2018
Date Tested: 05/15/2018
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Broke in Threads
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Slip (inch)Peak Load (lbf)Peak Stress (psi)CommentsTested By
3C01#11/36mm1.56015017096260Broke in ThreadsFred
Temperature 72 F
UTM 400KIP
Halo ID Small

Test 4 of 4

DIME Test ID: 2018-05-10-5-4
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 05/16/2018
Date Tested: 05/15/2018
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Slip (inch)Peak Load (lbf)Peak Stress (psi)CommentsTested By
4C01#11/36mm1.56014584093487OK NeckingFred
Temperature 72 F
UTM 400KIP
Halo ID Small