Sample Record for 2018-04-09-1

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 211848 DEA: 112T2174 EFIS: 1116000131 QA Service Level: 1
DIST-CO-RTE-PM: 11-SD-5-R37.4 - R46.5
Work Description: (Alternative Delivery) CMGC, San Elijo Highway Bridge Replacement. Replace the San Elijo lagoon highway bridge, construct HOV lanes, construct bike and pedestrian trails and bridge, build multi-use facility at Manchester Ave.
Location Description: IN SAN DIEGO COUNTY IN SOLANA BEACH AND ENCINITAS FROM 0.1 MILE NORTH OF LOMAS SANTA FE DRIVE OVERCROSSING TO 0.2 MILE SOUTH OF BIRMINGHAM DRIVE OVERCROSSING
Contractor Name: Flatiron-Skanska-Stacy and Witbeck, a Joint Venture
Contractor Address: 1770 La Costa Meadows Drive, San Marcos, CA 92078
Resident Engineer: Steve McMillan Structure Rep.: Phong Le

Sample Information

DIME Sample ID: 2018-04-09-1
TL Number from the TL Form: C953644
Sample Submitted By Organization: CT HQ - QASI Los Angeles Field Office
Sample Organization Contact: (858) 285-5797
Type of Sample: Quality Assurance
Type of Material: SMTL TM5 - Welded Hoops
Sample Taken Date: 04/09/2018
Date that the sample was received by the laboratory/organization performing the testing: 04/16/2018
The quantity of what the sample constitutes: 3 lots
A brief description of the sample: no 6 9 foot dia. Welded hoop
From where was the sample collected: Fabricator
Laboratory sample identification: Unknown
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: TNT Rebar

Material Information

Production or Authorization Testing: Production Testing
Service or Ultimate: Ultimate
Rebar Heat Number(s): 65028699-02
Hoop Manufacturer Lot Number(s): 18
Material Standard Code: ASTM A706
Material Grade: 60
Rebar Size: 6
Diameter of Hoop: 9'-0"
Epoxy Coated: No
Epoxy Coating Color: NA
Rebar Manufacturer: Gerdau
Welding Company: TNT Rebar
Coating Standards: Uncoated
Weld Type: Flash Welded

Test Results

Test 1 of 4

DIME Test ID: 2018-04-09-1-1
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 04/16/2018
Date Tested: 04/16/2018
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke; OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
118#6/19mm0.4444230100520Bar BrokeFred
UTM 400KIP
Temperature 72 F

Test 2 of 4

DIME Test ID: 2018-04-09-1-2
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 04/16/2018
Date Tested: 04/16/2018
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke in Weld; NO Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
218#6/19mm0.4444060100140Bar Broke in WeldFred
UTM 400KIP
Temperature 72 F

Test 3 of 4

DIME Test ID: 2018-04-09-1-3
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 04/16/2018
Date Tested: 04/16/2018
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke; OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
318#6/19mm0.4444000100000Bar BrokeFred
UTM 400KIP
Temperature 72 F

Test 4 of 4

DIME Test ID: 2018-04-09-1-4
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 04/16/2018
Date Tested: 04/16/2018
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke; OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
418#6/19mm0.444398099950Bar BrokeFred
UTM 400KIP
Temperature 72 F