Print Report | Back to Sample Detail

Sample Record for 2018-01-31-17

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 210569 DEA: 083555V4 EFIS: 0814000086 QA Service Level: 1
DIST-CO-RTE-PM: 08-SBD-15-42.5/46.0
Work Description: WIDEN I-15, RECONSTRUCT 3 IC'S, CONSTRUCT 2 NEW BR AND WIDEN 3 BR.
Location Description: SAN BERNARDINO COUNTY IN VICTORVILLE FROM 0.5 MILE NORTH OF MOJAVE DRIVE TO 1.5 MILE NORTH OF STODDARD WELLS ROAD OVERCROSSING
Contractor Name: Ames Construction
Contractor Address: 2000 AMES DRIVE, BURNSVILLE, MN 55306
Resident Engineer: Taghreed Al-Khateeb Structure Rep.: Ravinder Singh

Sample Information

DIME Sample ID: 2018-01-31-17
TL Number from the TL Form: C
Sample Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Sample Organization Contact: (530) 329-6527
Type of Sample: Quality Assurance
Type of Material: SMTL TM5 - Couplers
Sample Taken Date: 01/31/2018
Date that the sample was received by the laboratory/organization performing the testing: 02/16/2018
The quantity of what the sample constitutes: 8
A brief description of the sample: Griptwist Couplers
From where was the sample collected: Job Site
Laboratory sample identification: Unknown
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Gerdau BarSplce

Material Information

Production or Authorization Testing: Production Testing
Service or Ultimate: Ultimate
Material Standard Code: ASTM A706
Material Grade: 60
Rebar Manufacturer: Gerdau
Coupler Manufacturer: BarSplice
Intermediate Assembler or Fabricator: Unknown
Rebar Size: #11
Coupler Model: Grip Twist
Coating Standards: Uncoated
Shape of Rebar: Straight
Rebar Hoop Diameter: Unknown
Rebar Hoop Fabricator: Unknown
Coupler Component Heat/Lot Number(s): A170858
Rebar Heat Number(s): 6502630602
Rebar Size 2 :
Coupler Unique ID:

Test Results

Test 1 of 7

DIME Test ID: 2018-01-31-17-1
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 02/20/2018
Date Tested: 02/16/2018
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: necking okay
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Slip (inch)Peak Load (lbf)Peak Stress (psi)CommentsTested By
11#11/36mm1.56-0.00215314498169necking okayFred
Temperature 72 F
UTM 2000KIP
Halo ID Big

Test 2 of 7

DIME Test ID: 2018-01-31-17-2
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 02/20/2018
Date Tested: 02/16/2018
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: necking okay
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Slip (inch)Peak Load (lbf)Peak Stress (psi)CommentsTested By
21#11/36mm1.56015575799844necking okayFred
Temperature 72 F
UTM 2000KIP
Halo ID Big

Test 3 of 7

DIME Test ID: 2018-01-31-17-3
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 02/20/2018
Date Tested: 02/16/2018
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: necking okay
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Slip (inch)Peak Load (lbf)Peak Stress (psi)CommentsTested By
31#11/36mm1.560156494100320necking okayFred
Temperature 72 F
UTM 2000KIP
Halo ID Big

Test 4 of 7

DIME Test ID: 2018-01-31-17-4
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 02/20/2018
Date Tested: 02/16/2018
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Coupler Pull Threads
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Slip (inch)Peak Load (lbf)Peak Stress (psi)CommentsTested By
12#11/36mm1.56-0.000814214291117Coupler Pull ThreadsFred
Temperature 72 F
UTM 2000KIP
Halo ID Big

Test 5 of 7

DIME Test ID: 2018-01-31-17-5
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 02/20/2018
Date Tested: 02/16/2018
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: necking okay
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Slip (inch)Peak Load (lbf)Peak Stress (psi)CommentsTested By
22#11/36mm1.560157900101220necking okayFred
Temperature 72 F
UTM 2000KIP
Halo ID Big

Test 6 of 7

DIME Test ID: 2018-01-31-17-6
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 02/20/2018
Date Tested: 02/16/2018
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: necking okay
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Slip (inch)Peak Load (lbf)Peak Stress (psi)CommentsTested By
32#11/36mm1.56015420998852necking okayFred
Temperature 72 F
UTM 2000KIP
Halo ID Big

Test 7 of 7

DIME Test ID: 2018-01-31-17-7
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 02/20/2018
Date Tested: 02/16/2018
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: necking okay
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Slip (inch)Peak Load (lbf)Peak Stress (psi)CommentsTested By
42#11/36mm1.56015557599728necking okayFred
Temperature 72 F
UTM 2000KIP
Halo ID Big