Sample Record for 2018-01-05-1
Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project Information
Project ID: 211848 DEA: 112T2174 EFIS: 1116000131
QA Service Level: 1
DIST-CO-RTE-PM: 11-SD-5-R37.4 - R46.5
Work Description: (Alternative Delivery) CMGC, San Elijo Highway Bridge Replacement. Replace the San Elijo lagoon highway bridge, construct HOV lanes, construct bike and pedestrian trails and bridge, build multi-use facility at Manchester Ave.
Location Description: IN SAN DIEGO COUNTY IN SOLANA BEACH AND ENCINITAS FROM 0.1 MILE NORTH OF LOMAS SANTA FE DRIVE OVERCROSSING TO 0.2 MILE SOUTH OF BIRMINGHAM DRIVE OVERCROSSING
Contractor Name: Flatiron-Skanska-Stacy and Witbeck, a Joint Venture
Contractor Address: 1770 La Costa Meadows Drive, San Marcos, CA 92078
Resident Engineer: Steve McMillan Structure Rep.: Phong Le
Sample Information
DIME Sample ID: 2018-01-05-1
TL Number from the TL Form: C975253
Sample Submitted By Organization: CT HQ - QASI Los Angeles Field Office
Sample Organization Contact: (858) 285-5797
Type of Sample: Quality Assurance
Type of Material: SMTL TM5 - Couplers
Sample Taken Date: 01/05/2018
Date that the sample was received by the laboratory/organization performing the testing: 01/12/2018
The quantity of what the sample constitutes: 4
A brief description of the sample: HRC 410-490 Couplers
From where was the sample collected: Fabricator
Laboratory sample identification: Unknown
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: HRC
Material Information
Production or Authorization Testing: Production Testing
Service or Ultimate: Ultimate
Material Standard Code: ASTM A706
Material Grade: 60
Rebar Manufacturer: Gerdau
Coupler Manufacturer: HRC
Intermediate Assembler or Fabricator: To be performed at jobsite
Rebar Size: 18
Coupler Model: HRC 410/490
Coating Standards: Uncoated
Shape of Rebar: Straight
Rebar Hoop Diameter: NA
Rebar Hoop Fabricator: NA
Coupler Component Heat/Lot Number(s): N16101394, NF100886179
Rebar Heat Number(s): 65028611, 65028077
Rebar Size 2 :
Coupler Unique ID:
Test Results
Test 1 of 4
DIME Test ID: 2018-01-05-1-1
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 01/16/2018
Date Tested: 01/16/2018
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: necking okay
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 1 | 2 | #18/57mm | 4 | -0.0035 | 381297 | 95324 | necking okay | Fred |
| |
Temperature
|
72 F
|
UTM
|
2000KIP
|
Halo ID
|
Big
|
Test 2 of 4
DIME Test ID: 2018-01-05-1-2
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 01/16/2018
Date Tested: 01/16/2018
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: necking okay
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 2 | 2 | #18/57mm | 4 | 0 | 379361 | 94840 | necking okay | Fred |
| |
Temperature
|
72 F
|
UTM
|
2000KIP
|
Halo ID
|
Big
|
Test 3 of 4
DIME Test ID: 2018-01-05-1-3
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 01/16/2018
Date Tested: 01/16/2018
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Brittle Break
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 3 | 2 | #18/57mm | 4 | 0 | 393960 | 98490 | Brittle Break | Fred |
| |
Temperature
|
72 F
|
UTM
|
2000KIP
|
Halo ID
|
Big
|
Test 4 of 4
DIME Test ID: 2018-01-05-1-4
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 01/16/2018
Date Tested: 01/16/2018
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: necking okay
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 4 | 2 | #18/57mm | 4 | 0 | 381755 | 95439 | necking okay | Fred |
| |
Temperature
|
72 F
|
UTM
|
2000KIP
|
Halo ID
|
Big
|