Sample Record for 2017-10-24-9
Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project Information
Project ID: 212143 DEA: 101F1604 EFIS: 1016000107
QA Service Level: 1
DIST-CO-RTE-PM: 10-MER-33,5-R16.6
Work Description: BRIDGE REPAIR
Location Description: MERCED COUNTY IN SANTA NELLA AT ROUTE 33/5 SEPARATION
Contractor Name: VIKING CONSTRUCTION COMPANY, INC.
Contractor Address: 11315 Sunrise Gold Circle, Suite A, Rancho Cordova, CA 95742
Resident Engineer: Muhammad Rahman Structure Rep.: George Samuel
Sample Information
DIME Sample ID: 2017-10-24-9
TL Number from the TL Form: C06-001470
Sample Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Sample Organization Contact: (916) 227-7253
Type of Sample: Quality Assurance
Type of Material: SMTL TM5 - Couplers
Sample Taken Date: 10/24/2017
Date that the sample was received by the laboratory/organization performing the testing: 10/24/2017
The quantity of what the sample constitutes: 8
A brief description of the sample: 6, and 8 size couplers
From where was the sample collected: Job Site
Laboratory sample identification: Unknown
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Harris Rebar Dayton
Material Information
Production or Authorization Testing: Authorization Testing
Service or Ultimate: Service
Material Standard Code: ASTM A706
Material Grade: 60
Rebar Manufacturer: Nucor
Coupler Manufacturer: Dayton Superior
Intermediate Assembler or Fabricator: Unknown
Rebar Size: #6, #8
Coupler Model: Bar-Lock
Coating Standards: Uncoated
Shape of Rebar: Straight
Rebar Hoop Diameter: Unknown
Rebar Hoop Fabricator: Unknown
Coupler Component Heat/Lot Number(s): MM16106573, A152318, A150815
Rebar Heat Number(s): SE16104894, SE17100041
Rebar Size 2 :
Coupler Unique ID:
Test Results
Test 1 of 6
DIME Test ID: 2017-10-24-9-1
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 10/27/2017
Date Tested: 10/26/2017
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: paul.lukkarila@dot.ca.gov
Organization Phone: 916-227-7257
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 1 | 1 | #6/19mm | 0.44 | -0.0044 | 39061 | 88775 | Service Splice | Fred |
| |
Temperature
|
72 F
|
UTM
|
400KIP
|
Halo ID
|
Small
|
Test 2 of 6
DIME Test ID: 2017-10-24-9-2
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 10/27/2017
Date Tested: 10/26/2017
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: paul.lukkarila@dot.ca.gov
Organization Phone: 916-227-7257
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 2 | 1 | #6/19mm | 0.44 | 0 | 40345 | 91693 | Service Splice | Fred |
| |
Temperature
|
72 F
|
UTM
|
400KIP
|
Halo ID
|
Small
|
Test 3 of 6
DIME Test ID: 2017-10-24-9-3
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 10/27/2017
Date Tested: 10/26/2017
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: paul.lukkarila@dot.ca.gov
Organization Phone: 916-227-7257
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 3 | 1 | #6/19mm | 0.44 | 0 | 40248 | 91473 | Service Splice | Fred |
| |
Temperature
|
72 F
|
UTM
|
400KIP
|
Halo ID
|
Small
|
Test 4 of 6
DIME Test ID: 2017-10-24-9-4
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 10/27/2017
Date Tested: 10/26/2017
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: paul.lukkarila@dot.ca.gov
Organization Phone: 916-227-7257
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 1 | 1 | #8/25mm | 0.79 | -0.0032 | 74286 | 94033 | Service Splice | Fred |
| |
Temperature
|
72 F
|
UTM
|
400KIP
|
Halo ID
|
Small
|
Test 5 of 6
DIME Test ID: 2017-10-24-9-5
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 10/27/2017
Date Tested: 10/26/2017
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: paul.lukkarila@dot.ca.gov
Organization Phone: 916-227-7257
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 2 | 1 | #8/25mm | 0.79 | 0 | 73337 | 92832 | Service Splice | Fred |
| |
Temperature
|
72 F
|
UTM
|
400KIP
|
Halo ID
|
Small
|
Test 6 of 6
DIME Test ID: 2017-10-24-9-6
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 10/27/2017
Date Tested: 10/26/2017
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: paul.lukkarila@dot.ca.gov
Organization Phone: 916-227-7257
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 3 | 1 | #8/25mm | 0.79 | 0 | 76588 | 96947 | Service Splice | Fred |
| |
Temperature
|
72 F
|
UTM
|
400KIP
|
Halo ID
|
Small
|