Sample Record for 2017-10-20-1
Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project Information
Project ID: 211260 DEA: 072159U4 EFIS: 0715000160
QA Service Level: 1
DIST-CO-RTE-PM: 07-LA,ORA-5-0.0/1.5, 44.3/44.4
Work Description: CONSTRUCT HOV LANES AND MIX FLOW LANES.
Location Description: LOS ANGELES AND ORANGE COUNTIES IN BUENA PARK, LA MIRADA, CERRITOS AND SANTA FE SPRINGS FROM ARTESIA BOULEVARD UNDERCROSSING TO NORTH FORK COYOTE CREEK
Contractor Name: SECURITY PAVING COMPANY, INC.
Contractor Address: 3075 TOWNSGATE RD. SUITE 200, WESTLAKE VILLAGE, CA 91361
Resident Engineer: George Saker Structure Rep.: Danny Lalonde
Sample Information
DIME Sample ID: 2017-10-20-1
TL Number from the TL Form: Unknown
Sample Submitted By Organization: CT - Unassigned/General Field Laboratory
Sample Organization Contact: 5625005861
Type of Sample: Quality Assurance
Type of Material: SMTL TM5 - Welded Hoops
Sample Taken Date: 10/20/2017
Date that the sample was received by the laboratory/organization performing the testing: 10/24/2017
The quantity of what the sample constitutes: 5 lots
A brief description of the sample: Flash Welded Rebar Hoops
From where was the sample collected: Fabricator
Laboratory sample identification: Unknown
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: RKR
Material Information
Production or Authorization Testing: Authorization Testing
Service or Ultimate: Ultimate
Rebar Heat Number(s): 65025227
Hoop Manufacturer Lot Number(s): 16, 20
Material Standard Code: ASTM A706
Material Grade: 60
Rebar Size: 6
Diameter of Hoop: 2'-10"
Epoxy Coated: No
Epoxy Coating Color: NA
Rebar Manufacturer: CMC Rebar
Welding Company: RKR Steel Welding
Coating Standards: Uncoated
Weld Type: Flash Welded
Test Results
Test 1 of 6
DIME Test ID: 2017-10-20-1-1
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 10/27/2017
Date Tested: 10/27/2017
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke; OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 1 | 16 | #6/19mm | 0.44 | 44600 | 101360 | Bar Broke | Fred |
| |
UTM
|
400KIP
|
Temperature
|
72 F
|
Test 2 of 6
DIME Test ID: 2017-10-20-1-2
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 10/27/2017
Date Tested: 10/27/2017
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke; OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 2 | 16 | #6/19mm | 0.44 | 44870 | 101980 | Bar Broke | Fred |
| |
UTM
|
400KIP
|
Temperature
|
72 F
|
Test 3 of 6
DIME Test ID: 2017-10-20-1-3
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 10/27/2017
Date Tested: 10/27/2017
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke; OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 3 | 16 | #6/19mm | 0.44 | 44420 | 100950 | Bar Broke | Fred |
| |
UTM
|
400KIP
|
Temperature
|
72 F
|
Test 4 of 6
DIME Test ID: 2017-10-20-1-4
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 10/27/2017
Date Tested: 10/27/2017
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke; OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 1 | 20 | #6/19mm | 0.44 | 43690 | 99300 | Bar Broke | Fred |
| |
UTM
|
400KIP
|
Temperature
|
72 F
|
Test 5 of 6
DIME Test ID: 2017-10-20-1-5
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 10/27/2017
Date Tested: 10/27/2017
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke; OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 2 | 20 | #6/19mm | 0.44 | 42670 | 96980 | Bar Broke | Fred |
| |
UTM
|
400KIP
|
Temperature
|
72 F
|
Test 6 of 6
DIME Test ID: 2017-10-20-1-6
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 10/27/2017
Date Tested: 10/27/2017
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke; OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 3 | 20 | #6/19mm | 0.44 | 43750 | 99430 | Bar Broke | Fred |
| |
UTM
|
400KIP
|
Temperature
|
72 F
|