Gavin Newsom, Governor |
DEPARTMENT OF TRANSPORTATIONDIVISION OF ENGINEERING SERVICES MATERIALS ENGINEERING AND TESTING SERVICES Concrete Materials Testing Branch 5900 Folsom Blvd. Sacramento, CA 95819 916-227-7205 |
Contract # 04235624 Cty SCL Rte 101 PM 52.0/52.6,0.0/0.6 Vendor # |
REPORT OF LABORATORY TESTING |
||||
Resident Engineer: |
Fernando Abela |
Date Reported: |
10/09/2017 |
|
Address: |
TL Number: |
|
||
City: |
||||
Project Name: BRIDGE REPLACEMENT |
||||
Prime Contractor: GHILOTTI BROS / RM HARRIS JV |
||||
Sample Taken Date: |
09/11/2017 |
Mix Design: |
D101C5E1 |
|
Contractor: Unknown |
Location : SANTA CLARA AND SAN MATEO COUNTIES IN PALO ALTO AND EAST PALO ALTO FROM OREGON EXPRESSWAY OVERCROSSING TO 0.3 MILE SOUTH OF UNIVERSITY AVENUE OVERCROSSING |
|||
Structure unique identifier: |
||||
Structure name: |
||||
Location of Pour: |
The following testing has been tested in accordance with:
ASTM C39-10 : Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens
Capped in accordance with ASTM C617/CTM521
Cured in accordance with ASTM C511
Specimen | Cross sectional area of cylinder (in^2) | Average diameter of cylinder (in) | Compressive strength of cylinder (psi) | Maximum load on cylinder (lb) | Type of fracture pattern of cylinder |
---|---|---|---|---|---|
1 | 28.46 | 6.02 | 5842.8 | 166287 | 1 |
2 | 28.46 | 6.02 | 6041.7 | 171947 | 1 |
DIME Test ID: 2017-09-11-15-1
Number of specimens: 2
Compressive strength (to nearest 10 psi): 5940
Age of specimen: 28 days
Certified By: Mike Mullins
*Subject to final inspection by the Resident Engineer. |
TL- Report of Laboratory Testing