Gavin Newsom, Governor |
DEPARTMENT OF TRANSPORTATIONDIVISION OF ENGINEERING SERVICES MATERIALS ENGINEERING AND TESTING SERVICES Concrete Materials Testing Branch 5900 Folsom Blvd. Sacramento, CA 95819 916-227-7205 |
Contract # 042A3204 Cty NAP Rte 121 PM 9.2/9.4 Vendor # |
REPORT OF LABORATORY TESTING |
||||
Resident Engineer: |
Fernando Dos Santos |
Date Reported: |
09/05/2017 |
|
Address: |
TL Number: |
210265 |
||
City: |
||||
Project Name: ROADWAY WIDENING, BRIDGE REPLACEMENT, CREEK GRADING |
||||
Prime Contractor: GHILOTTI CONSTRUCTION COMPANY |
||||
Sample Taken Date: |
08/07/2017 |
Mix Design: |
ct063cr5 |
|
Contractor: Unknown |
Location: NAPA COUNTY IN NAPA AT SILVERADO TRAIL ROAD |
|||
Structure unique identifier: Unknown |
||||
Structure name: Unknown |
||||
Location of Pour: Unknown |
The following testing has been tested in accordance with:
ASTM C39-10 : Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens
Capped in accordance with ASTM C617/CTM521
Specimen | Cross sectional area of cylinder (in^2) | Average diameter of cylinder (in) | Compressive strength of cylinder (psi) | Maximum load on cylinder (lb) | Type of fracture pattern of cylinder |
---|---|---|---|---|---|
1 | 28.18 | 5.99 | 4381.9 | 123481 | 1 |
2 | 28.18 | 5.99 | 4468.6 | 125925 | 1 |
DIME Test ID: 2017-08-07-16-1
Number of specimens: 2
Compressive strength (to nearest 10 psi): 4430
Age of specimen: 28 days
Certified By: Mike Mullins
*Subject to final inspection by the Resident Engineer. |
TL- Report of Laboratory Testing