Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project ID: 212523 DEA: 033H3504 EFIS: 0317000327
QA Service Level: 1
DIST-CO-RTE-PM: 03-SIE-49-45.19
Work Description: Construct Viaduct and re-establish both lanes of travel
Location Description:
Contractor Name: Golden State Bridge
Contractor Address: 3701 Mallard Drive, Benicia, CA 94510
Resident Engineer: Tim Crosby Structure Rep.: Jimmer Ross
DIME Sample ID: 2017-08-08-1
TL Number from the TL Form: C740718
Sample Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Sample Organization Contact: (530) 329-6527
Type of Sample: Quality Assurance
Type of Material: SMTL TM5 - Welded Hoops
Sample Taken Date: 08/08/2017
Date that the sample was received by the laboratory/organization performing the testing: 08/08/2017
The quantity of what the sample constitutes: 8
A brief description of the sample: 8 Flash Welded Rebar Hoops
From where was the sample collected: Fabricator
Laboratory sample identification: Unknown
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Harris Rebar Nucor
Production or Authorization Testing: Production Testing
Service or Ultimate: Ultimate
Rebar Heat Number(s): SE15101974
Hoop Manufacturer Lot Number(s): H04, H05
Material Standard Code: ASTM A706
Material Grade: 60
Rebar Size: 8
Diameter of Hoop: 5'-6"
Epoxy Coated: No
Epoxy Coating Color: NA
Rebar Manufacturer: Nucor
Welding Company: Harris Rebar
Coating Standards: Uncoated
Weld Type: Flash Welded
DIME Test ID: 2017-08-08-1-1
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 08/08/2017
Date Tested: 08/08/2017
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke; OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 1 | H04 | #8/25mm | 0.79 | 76990 | 97460 | Bar Broke | Brian |
| |
UTM
|
400KIP
|
Temperature
|
72 F
|
DIME Test ID: 2017-08-08-1-2
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 08/08/2017
Date Tested: 08/08/2017
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke; OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 2 | H04 | #8/25mm | 0.79 | 76960 | 97420 | Bar Broke | Brian |
| |
UTM
|
400KIP
|
Temperature
|
72 F
|
DIME Test ID: 2017-08-08-1-3
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 08/08/2017
Date Tested: 08/08/2017
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke; OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 3 | H04 | #8/25mm | 0.79 | 77280 | 97820 | Bar Broke | Brian |
| |
UTM
|
400KIP
|
Temperature
|
72 F
|
DIME Test ID: 2017-08-08-1-4
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 08/08/2017
Date Tested: 08/08/2017
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke; OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 1 | H05 | #8/25mm | 0.79 | 76960 | 97420 | Bar Broke | Brian |
| |
UTM
|
400KIP
|
Temperature
|
72 F
|
DIME Test ID: 2017-08-08-1-5
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 08/08/2017
Date Tested: 08/08/2017
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke; OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 2 | H05 | #8/25mm | 0.79 | 77140 | 97650 | Bar Broke | Brian |
| |
UTM
|
400KIP
|
Temperature
|
72 F
|
DIME Test ID: 2017-08-08-1-6
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 08/08/2017
Date Tested: 08/08/2017
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke; OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 3 | H05 | #8/25mm | 0.79 | 77510 | 98110 | Bar Broke | Brian |
| |
UTM
|
400KIP
|
Temperature
|
72 F
|