Gavin Newsom, Governor |
DEPARTMENT OF TRANSPORTATIONDIVISION OF ENGINEERING SERVICES MATERIALS ENGINEERING AND TESTING SERVICES Concrete Materials Testing Branch 5900 Folsom Blvd. Sacramento, CA 95819 916-227-7205 |
Contract # 042A3204 Cty NAP Rte 121 PM 9.2/9.4 Vendor # |
REPORT OF LABORATORY TESTING |
||||
Resident Engineer: |
Fernando Dos Santos |
Date Reported: |
08/02/2017 |
|
Address: |
TL Number: |
210261 |
||
City: |
||||
Project Name: ROADWAY WIDENING, BRIDGE REPLACEMENT, CREEK GRADING |
||||
Prime Contractor: GHILOTTI CONSTRUCTION COMPANY |
||||
Sample Taken Date: |
07/28/2017 |
Mix Design: |
CT063CR5 |
|
Contractor: Unknown |
Location: NAPA COUNTY IN NAPA AT SILVERADO TRAIL ROAD |
|||
Structure unique identifier: Unknown |
||||
Structure name: Unknown |
||||
Location of Pour: Unknown |
The following testing has been tested in accordance with:
ASTM C39-17a : Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens
Capped in accordance with ASTM C617/CTM521
Specimen | Average diameter of cylinder (in) | Cross sectional area of cylinder (in^2) | Maximum load on cylinder (lb) | Compressive strength of cylinder (psi) | Type of fracture pattern of cylinder |
---|---|---|---|---|---|
1 | 6.02 | 28.46 | 66969 | 2353.1 | 1 |
2 | 6.02 | 28.46 | 66902 | 2350.7 | 1 |
DIME Test ID: 2017-07-28-12-1
Number of specimens: 2
Compressive strength (to nearest 10 psi): 2350
Age of specimen: 5 days
Certified By: Bang Nguyen
*Subject to final inspection by the Resident Engineer. |
TL- Report of Laboratory Testing