Sample Record for 2017-07-18-17
Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project Information
Project ID: 211588 DEA: 030F3104 EFIS: 0300000078
QA Service Level: 1
DIST-CO-RTE-PM: 03-ED-49-23.6/24.5
Work Description: REPLACE BRIDGE.
Location Description: EL DORADO COUNTY NEAR COLOMA FROM 0.1 MILE EAST OF MARSHALL ROAD TO 0.3 MILE EAST OF LOTUS ROAD
Contractor Name: M.C.M. CONSTRUCTION, INC.
Contractor Address: P.O. Box 620, North Highlands, CA 95660
Resident Engineer: Jeff Hamm Structure Rep.: Glen Wheeler
Sample Information
DIME Sample ID: 2017-07-18-17
TL Number from the TL Form: C543601
Sample Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Sample Organization Contact: (530) 329-6527
Type of Sample: Quality Assurance
Type of Material: SMTL TM5 - Couplers
Sample Taken Date: 07/18/2017
Date that the sample was received by the laboratory/organization performing the testing: 07/20/2017
The quantity of what the sample constitutes: 8
A brief description of the sample: 14 Rebar Couplers
From where was the sample collected: Job Site
Laboratory sample identification: Unknown
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: HRC Gerdau
Material Information
Production or Authorization Testing: Production Testing
Service or Ultimate: Service
Material Standard Code: ASTM A706
Material Grade: 60
Rebar Manufacturer: Gerdau
Coupler Manufacturer: HRC
Intermediate Assembler or Fabricator: Unknown
Rebar Size: 14
Coupler Model: HRC 500-510
Coating Standards: Uncoated
Shape of Rebar: Straight
Rebar Hoop Diameter: Unknown
Rebar Hoop Fabricator: Unknown
Coupler Component Heat/Lot Number(s): ABC123
Rebar Heat Number(s): 65023793 02
Rebar Size 2 :
Coupler Unique ID:
Test Results
Test 1 of 6
DIME Test ID: 2017-07-18-17-1
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 07/21/2017
Date Tested: 07/20/2017
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 1 | 1 | #14/43mm | 2.25 | -0.006 | 221857 | 98603 | Service Splice | Brian |
| |
Temperature
|
72 F
|
UTM
|
2000KIP
|
Halo ID
|
Small
|
Test 2 of 6
DIME Test ID: 2017-07-18-17-2
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 07/21/2017
Date Tested: 07/20/2017
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 2 | 1 | #14/43mm | 2.25 | 0 | 215408 | 95737 | Service Splice | Brian |
| |
Temperature
|
72 F
|
UTM
|
2000KIP
|
Halo ID
|
Small
|
Test 3 of 6
DIME Test ID: 2017-07-18-17-3
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 07/21/2017
Date Tested: 07/20/2017
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 3 | 1 | #14/43mm | 2.25 | 0 | 215847 | 95932 | Service Splice | Brian |
| |
Temperature
|
72 F
|
UTM
|
2000KIP
|
Halo ID
|
Small
|
Test 4 of 6
DIME Test ID: 2017-07-18-17-4
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 07/21/2017
Date Tested: 07/20/2017
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 1 | 2 | #14/43mm | 2.25 | -0.0123 | 216527 | 96234 | Service Splice | Brian |
| |
Temperature
|
72 F
|
UTM
|
2000KIP
|
Halo ID
|
Small
|
Test 5 of 6
DIME Test ID: 2017-07-18-17-5
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 07/21/2017
Date Tested: 07/20/2017
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 2 | 2 | #14/43mm | 2.25 | 0 | 217113 | 96495 | Service Splice | Brian |
| |
Temperature
|
72 F
|
UTM
|
2000KIP
|
Halo ID
|
Small
|
Test 6 of 6
DIME Test ID: 2017-07-18-17-6
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 07/21/2017
Date Tested: 07/20/2017
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 3 | 2 | #14/43mm | 2.25 | 0 | 217022 | 96454 | Service Splice | Brian |
| |
Temperature
|
72 F
|
UTM
|
2000KIP
|
Halo ID
|
Small
|