Gavin Newsom, Governor |
DEPARTMENT OF TRANSPORTATIONDIVISION OF ENGINEERING SERVICES MATERIALS ENGINEERING AND TESTING SERVICES Concrete Materials Testing Branch 5900 Folsom Blvd. Sacramento, CA 95819 916-227-7205 |
Contract # 044K2404 Cty MRN Rte 1 PM 10.9, 10.8/10.9, 10.90, 6.6/10.9 Vendor # |
REPORT OF LABORATORY TESTING |
||||
Resident Engineer: |
Dawit Habteselassie |
Date Reported: |
05/17/2017 |
|
Address: |
TL Number: |
|
||
City: |
||||
Project Name: Construct Solier Pile Wall |
||||
Prime Contractor: Drill Tech |
||||
Sample Taken Date: |
04/19/2017 |
Mix Design: |
4700P |
|
Contractor: Unknown |
Location : |
|||
Structure unique identifier: Retaining Wall |
||||
Structure name: Retaining Wall |
||||
Location of Pour: soldier pile wall |
The following testing has been tested in accordance with:
ASTM C39-17a : Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens
Capped in accordance with ASTM C617/CTM521
Cured in accordance with ASTM C511
Specimen | Average diameter of cylinder (in) | Cross sectional area of cylinder (in^2) | Maximum load on cylinder (lb) | Compressive strength of cylinder (psi) | Type of fracture pattern of cylinder |
---|---|---|---|---|---|
1 | 6.02 | 28.46 | 167496 | 5885.3 | 1 |
2 | 6.03 | 28.56 | 166731 | 5837.9 | 1 |
DIME Test ID: 2017-04-19-13-1
Number of specimens: 2
Compressive strength (to nearest 10 psi): 5860
Age of specimen: 28 days
Certified By: Bang Nguyen
*Subject to final inspection by the Resident Engineer. |
TL- Report of Laboratory Testing