Print Report | Back to Sample Detail

Sample Record for 2017-02-16-4

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 211950 DEA: 101E0504 EFIS: 1016000014 MINOR: 10A1823 QA Service Level: 1
DIST-CO-RTE-PM: 10--12-6.3
Work Description: Install Flashing Beacons
Location Description: In Calaveras County
Contractor Name: ST. FRANCIS ELECTRIC
Contractor Address: 975 Carden Street, San Leandro, CA 94577
Resident Engineer: Pawan Garg Structure Rep.: Unknown

Sample Information

DIME Sample ID: 2017-02-16-4
TL Number from the TL Form:
Sample Submitted By Organization: CT HQ - QASI Bay Area Field Office
Sample Organization Contact: (916) 284-6784
Type of Sample: Quality Control
Type of Material: SMTL TM5 - Welded Hoops
Sample Taken Date: 02/16/2017
Date that the sample was received by the laboratory/organization performing the testing: 02/16/2017
The quantity of what the sample constitutes: 34
A brief description of the sample: Ultimate Butt Splice
From where was the sample collected: Fabricator
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Harris Rebar

Material Information

Production or Authorization Testing: Production Testing
Service or Ultimate: Ultimate
Rebar Heat Number(s): 582535
Hoop Manufacturer Lot Number(s): H01
Material Standard Code: ASTM A706
Material Grade: 60
Rebar Size: 4
Diameter of Hoop: 2'-2"
Epoxy Coated: No
Epoxy Coating Color: NA
Rebar Manufacturer: Evraz
Welding Company: Harris Rebar
Coating Standards: Uncoated
Weld Type: Flash Welded

Test Results