Sample Record for 2017-02-09-2
Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project Information
Project ID: 210735 DEA: 071193U4 EFIS: 0713000007
QA Service Level: 1
DIST-CO-RTE-PM: 07-LA-10-37.2/42.4
Work Description: CONSTRUCT HOV LANES, WIDEN BRIDGES, AND REALIGN RAMPS.
Location Description: IN LA COUNTY FROM CITRUS STREET IN WEST COVINA TO ROUTE 57 IN POMONA
Contractor Name: Guy F. Atkinson
Contractor Address: 18201 Von Karman Ave, Suite #800, IRVINE CA 92612
Resident Engineer: Rodolfo Cao Structure Rep.: David Win
Sample Information
DIME Sample ID: 2017-02-09-2
TL Number from the TL Form: NA
Sample Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Sample Organization Contact: (530) 329-6527
Type of Sample: Retest
Type of Material: SMTL TM5 - Couplers
Sample Taken Date: 02/09/2017
Date that the sample was received by the laboratory/organization performing the testing: 02/14/2017
The quantity of what the sample constitutes: 4
A brief description of the sample: Barsplice Double Barrel Zap Screwlok
From where was the sample collected: Job Site
Laboratory sample identification: Unknown
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Barsplice, CMC rebar
Material Information
Production or Authorization Testing: Retest
Service or Ultimate: Service
Material Standard Code: ASTM A706
Material Grade: 60
Rebar Manufacturer: CMC Rebar
Coupler Manufacturer: Barsplice
Intermediate Assembler or Fabricator: Unknown
Rebar Size: #5
Coupler Model: Barsplice Double Barrel Zap Screwlok
Coating Standards: Uncoated
Shape of Rebar: Straight
Rebar Hoop Diameter: Unknown
Rebar Hoop Fabricator: Unknown
Coupler Component Heat/Lot Number(s): 2145
Rebar Heat Number(s): 589592
Rebar Size 2 :
Coupler Unique ID:
Test Results
Test 1 of 4
DIME Test ID: 2017-02-09-2-1
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 02/15/2017
Date Tested: 02/15/2017
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 1 | | #5/16mm | 0.31 | 27300 | 88060 | Service Splice | Brian |
| |
UTM
|
400KIP
|
Temperature
|
72 F
|
Test 2 of 4
DIME Test ID: 2017-02-09-2-2
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 02/15/2017
Date Tested: 02/15/2017
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 2 | | #5/16mm | 0.31 | 27240 | 87870 | Service Splice | Brian |
| |
UTM
|
400KIP
|
Temperature
|
72 F
|
Test 3 of 4
DIME Test ID: 2017-02-09-2-3
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 02/15/2017
Date Tested: 02/15/2017
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 3 | | #5/16mm | 0.31 | 28570 | 92160 | Service Splice | Brian |
| |
UTM
|
400KIP
|
Temperature
|
72 F
|
Test 4 of 4
DIME Test ID: 2017-02-09-2-4
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 02/15/2017
Date Tested: 02/15/2017
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 4 | | #5/16mm | 0.31 | 28950 | 93390 | Service Splice | Brian |
| |
UTM
|
400KIP
|
Temperature
|
72 F
|