Sample Record for 2017-01-06-3
Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project Information
Project ID: 7285 DEA: 040120T4 EFIS: 0400000027
QA Service Level: 1
DIST-CO-RTE-PM: 04-SF-80-12.6/13.9
Work Description: CONSTRUCT BRIDGE, ROADWAYS, ELECTRICAL, BUILDINGS AND REMOVE BRIDGES
Location Description: THE CITY AND COUNTY OF SAN FRANCISCO FROM THE YERBA BUENA TUNNEL TO 1.3 KM EAST OF THE YERBA BUENA TUNNEL
Contractor Name: CALIFORNIA ENGINEERING CONTRACTORS, INC.
Contractor Address: 20 HAPPY VALLEY ROAD, PLEASANTON, CA 94566
Resident Engineer: Tom Larwin Structure Rep.: Mehran Ardakanian
Sample Information
DIME Sample ID: 2017-01-06-3
TL Number from the TL Form: Unknown
Sample Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Sample Organization Contact: (530) 329-6527
Type of Sample: Quality Assurance
Type of Material: SMTL TM5 - Couplers
Sample Taken Date: 01/06/2017
Date that the sample was received by the laboratory/organization performing the testing: 02/02/2017
The quantity of what the sample constitutes: 16
A brief description of the sample: 10 Rebar Couplers
From where was the sample collected: Job Site
Laboratory sample identification: Unknown
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: CMC Rebar, HRC
Material Information
Production or Authorization Testing: Production Testing
Service or Ultimate: Ultimate
Material Standard Code: ASTM A706
Material Grade: 60
Rebar Manufacturer: CMC Rebar
Coupler Manufacturer: HRC
Intermediate Assembler or Fabricator: Unknown
Rebar Size: 10
Coupler Model: 500 / 510
Coating Standards: Uncoated
Shape of Rebar: Straight
Rebar Hoop Diameter: Unknown
Rebar Hoop Fabricator: Unknown
Coupler Component Heat/Lot Number(s): A146514, 75061855
Rebar Heat Number(s): 4057645
Rebar Size 2 :
Coupler Unique ID:
Test Results
Test 1 of 6
DIME Test ID: 2017-01-06-3-1
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 02/03/2017
Date Tested: 02/03/2017
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: necking okay
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 1 | | #10/32mm | 1.27 | -0.0071 | 116682 | 91876 | necking okay | Brian |
| |
Temperature
|
72 F
|
UTM
|
2000KIP
|
Halo ID
|
Small
|
Test 2 of 6
DIME Test ID: 2017-01-06-3-2
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 02/03/2017
Date Tested: 02/03/2017
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: necking okay
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 2 | | #10/32mm | 1.27 | 0 | 115960 | 91307 | necking okay | Brian |
| |
Temperature
|
72 F
|
UTM
|
2000KIP
|
Halo ID
|
Small
|
Test 3 of 6
DIME Test ID: 2017-01-06-3-3
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 02/03/2017
Date Tested: 02/03/2017
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: necking okay
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 3 | | #10/32mm | 1.27 | 0 | 116545 | 91768 | necking okay | Brian |
| |
Temperature
|
72 F
|
UTM
|
2000KIP
|
Halo ID
|
Small
|
Test 4 of 6
DIME Test ID: 2017-01-06-3-4
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 02/03/2017
Date Tested: 02/03/2017
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 4 | | #10/32mm | 1.27 | -0.0036 | 115932 | 91285 | Service Splice | Brian |
| |
Temperature
|
72 F
|
UTM
|
2000KIP
|
Halo ID
|
Small
|
Test 5 of 6
DIME Test ID: 2017-01-06-3-5
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 02/03/2017
Date Tested: 02/03/2017
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 5 | | #10/32mm | 1.27 | 0 | 116033 | 91365 | Service Splice | Brian |
| |
Temperature
|
72 F
|
UTM
|
2000KIP
|
Halo ID
|
Small
|
Test 6 of 6
DIME Test ID: 2017-01-06-3-6
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 02/03/2017
Date Tested: 02/03/2017
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 6 | | #10/32mm | 1.27 | 0 | 116159 | 91464 | Service Splice | Brian |
| |
Temperature
|
72 F
|
UTM
|
2000KIP
|
Halo ID
|
Small
|