Sample Record for 2017-01-18-3
Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project Information
Project ID: 7613 DEA: 071218W4 EFIS: 0700021119
QA Service Level: 1
DIST-CO-RTE-PM: 07-LA-5-29.4/31.6
Work Description: REALIGN ROUTE 5 AND RAILROAD TRACKS AND RECONFIGURE ON- AND OFF-RAMPS.
Location Description: LOS ANGELES COUNTY IN BURBANK FROM WEST MAGNOLIA BOULEVARD OVERCROSSING TO 0.3 MILE NORTH OF BUENA VISTA STREET/WINONA AVENUE UNDERCROSSING
Contractor Name: SECURITY PAVING COMPANY, INC.
Contractor Address: 13170 TELFAIR AVENUE, SYLMAR, CA 91342
Resident Engineer: Vladimir Gurfinkel Structure Rep.: Gon Choi
Sample Information
DIME Sample ID: 2017-01-18-3
TL Number from the TL Form: C672286
Sample Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Sample Organization Contact: (530) 329-6527
Type of Sample: Quality Assurance
Type of Material: SMTL TM5 - Couplers
Sample Taken Date: 01/18/2017
Date that the sample was received by the laboratory/organization performing the testing: 01/20/2017
The quantity of what the sample constitutes: 4
A brief description of the sample: BarGrip XL Coupler
From where was the sample collected: Job Site
Laboratory sample identification: Unknown
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Gerdau, Integrity Rebar
Material Information
Production or Authorization Testing: Production Testing
Service or Ultimate: Ultimate
Material Standard Code: ASTM A706
Material Grade: 60
Rebar Manufacturer: Gerdau Integrity Rebar
Coupler Manufacturer: BarSplice
Intermediate Assembler or Fabricator: Unknown
Rebar Size: #11
Coupler Model: BarGrip XL Coupler
Coating Standards: Uncoated
Shape of Rebar: Straight
Rebar Hoop Diameter: Unknown
Rebar Hoop Fabricator: Unknown
Coupler Component Heat/Lot Number(s): 72067884
Rebar Heat Number(s): 65024960
Rebar Size 2 :
Coupler Unique ID:
Test Results
Test 1 of 4
DIME Test ID: 2017-01-18-3-1
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 01/23/2017
Date Tested: 01/20/2017
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: necking okay
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 1 | 1 | #11/36mm | 1.56 | -0.0013 | 151196 | 96921 | necking okay | Fred |
| |
Temperature
|
72 F
|
UTM
|
2000KIP
|
Halo ID
|
Big
|
Test 2 of 4
DIME Test ID: 2017-01-18-3-2
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 01/23/2017
Date Tested: 01/20/2017
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: necking okay
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 2 | 1 | #11/36mm | 1.56 | 0 | 150571 | 96520 | necking okay | Fred |
| |
Temperature
|
72 F
|
UTM
|
2000KIP
|
Halo ID
|
Big
|
Test 3 of 4
DIME Test ID: 2017-01-18-3-3
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 01/23/2017
Date Tested: 01/20/2017
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Pull Out of Coupler
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 3 | 1 | #11/36mm | 1.56 | 0 | 150131 | 96238 | Pull Out of Coupler | Fred |
| |
Temperature
|
72 F
|
UTM
|
2000KIP
|
Halo ID
|
Big
|
Test 4 of 4
DIME Test ID: 2017-01-18-3-4
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 01/23/2017
Date Tested: 01/20/2017
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Pull Out of Coupler
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 4 | 1 | #11/36mm | 1.56 | 0 | 148393 | 95124 | Pull Out of Coupler | Fred |
| |
Temperature
|
72 F
|
UTM
|
2000KIP
|
Halo ID
|
Big
|