Sample Record for 2024-04-27-30

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 994785 DEA: 023H32U4 EFIS: 0221000164 QA Service Level: 1
DIST-CO-RTE-PM: 02-SIS-I5-2.5/R15.9
Work Description: Roadway rehabilitation and bridge improvements along I5 in Mount Shasta
Location Description: SIS I5 2.5/R15.9
Contractor Name: Gordon Stout - Walsh/Myers
Contractor Address: 1390 Willow Pass Rd Suite 950, Concord, CA 94520
Resident Engineer: Austin Henry Structure Rep.: Mike Sears

Sample Information

DIME Sample ID: 2024-04-27-30
TL Number from the TL Form: 899683
Sample Submitted By Organization: CT D02 - Redding Northern Regional Laboratory
Sample Organization Contact: (530) 225-3194
Type of Sample: Production Start-Up
Type of Material: Reclaimed Asphalt Pavement
Sample Taken Date: 04/27/2024
Date that the sample was received by the laboratory/organization performing the testing: 04/29/2024
The quantity of what the sample constitutes: Production Start-Up Evaluation
A brief description of the sample: 2 bags of Combined RAP (1/2-inch)
From where was the sample collected: Manufacturer
Laboratory sample identification: D79487
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Tullis — Northstate Asphalt (Redding, CA)

Material Information

RAP Source: Northstate Asphalt
Aggregate Size: 1/2-inch
Aggregate Source:
RAP Stockpile:
Stockpile Size (tons):
Reclaimed Asphalt Pavement Mix Number:

Test Results

Test 1 of 3

DIME Test ID: 2024-04-27-30-1
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Verified Date: 08/16/2024
Date Tested: 05/24/2024
Submitted By Organization: CT D02 - Redding Northern Regional Laboratory
Organization Address: 1657 Riverside Drive,
Organization City: Redding
Organization State: CA
Organization Zipcode: 96001
Organization Email: ward.jenkins@dot.ca.gov
Organization Phone: 530-225-3194
General Comments for this Test: Pbr(uncorrected)=4.90%, Pbr≈3.54%
Test Result Compliance: complies
Additional Comments When Verified:
What temperature unit is used? Celsius
Test procedure used? Method A
Mass of the specimen basket assembly 3154.9 g
Mass of the specimen and specimen basket assembly prior to ignition 4819.6 g
Mass of HMA Sample prior to ignition 1664.7 g
Corrected Asphalt Binder Content 4.9 %
Mass Loss 84.5 g
Mass of aggregate remaining after ignition 1580.2 g
Correction Factor (Percent by mass of HMA Specimen) no data0 %
Moisture Content no data0 %
Temperature Compensation Factor 0.18 %
Test Temperature 538 C

Test 2 of 3

DIME Test ID: 2024-04-27-30-2
Test Method: AASHTO T30-19: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Verified Date: 08/16/2024
Date Tested: 05/28/2024
Submitted By Organization: CT D02 - Redding Northern Regional Laboratory
Organization Address: 1657 Riverside Drive,
Organization City: Redding
Organization State: CA
Organization Zipcode: 96001
Organization Email: ward.jenkins@dot.ca.gov
Organization Phone: 530-225-3194
General Comments for this Test:
Test Result Compliance: not applicable
Additional Comments When Verified:
Is an aggregate correction factor used? Yes
Aggregate correction factor for the 2 in. sieve (% passing) no data0 %
Aggregate correction factor for the 1 1/2 in. sieve (% passing) no data0 %
Aggregate correction factor for the 1 in. sieve (% passing) no data0 %
Aggregate correction factor for the 3/4 in. sieve (% passing) no data0 %
Aggregate correction factor for the 1/2 in. sieve (% passing) -0.1 %
Aggregate correction factor for the 3/8 in. sieve (% passing) -1 %
Aggregate correction factor for the #4 sieve (% passing) -1 %
Aggregate correction factor for the #8 sieve (% passing) -0.9 %
Aggregate correction factor for the #16 sieve (% passing) -0.8 %
Aggregate correction factor for the #30 sieve (% passing) -1.2 %
Aggregate correction factor for the #50 sieve (% passing) -0.8 %
Aggregate correction factor for the #100 sieve (% passing) -0.7 %
Aggregate correction factor for the #200 sieve (% passing) -0.6 %
Cumulative percent passing the 2 in. sieve 100 %
Cumulative percent passing the 1 1/2 in. sieve 100 %
Cumulative percent passing the 1 in. sieve 100 %
Cumulative percent passing the 3/4 in. sieve 100 %
Cumulative percent passing the 1/2 in. sieve 85 %
Cumulative percent passing the 3/8 in. sieve 70 %
Cumulative percent passing the #4 sieve 49 %
Cumulative percent passing the #8 sieve 36 %
Cumulative percent passing the #16 sieve 26 %
Cumulative percent passing the #30 sieve 18 %
Cumulative percent passing the #50 sieve 14 %
Cumulative percent passing the #100 sieve 10 %
Cumulative percent passing the #200 sieve 8.2 %

Test 3 of 3

DIME Test ID: 2024-04-27-30-3
Test Method: AASHTO T209-12: Standard Method of Test for Theoretical Maximum Specific Gravity (Gmm) and Density of Asphalt Mixtures (Maximum Specific Gravity)
Verified Date: 08/16/2024
Date Tested: 05/28/2024
Submitted By Organization: CT D02 - Redding Northern Regional Laboratory
Organization Address: 1657 Riverside Drive,
Organization City: Redding
Organization State: CA
Organization Zipcode: 96001
Organization Email: ward.jenkins@dot.ca.gov
Organization Phone: 530-225-3194
General Comments for this Test: Gmmr=2.600, Gser≈2.752
Test Result Compliance: complies
Additional Comments When Verified:
Number of tests 1
What is the unit of measurement for theoretical density? SI Units
Mass Determination Air
Method Performed Mechanical Agitation - Method A
Mass of container filled with water 7334.2 grams
Mass of oven-dry sample in air for Sample 1 1635.2 grams
Mass of container filled with the sample and water for Sample 1 8340.5 grams
Temperature of Water 25 °F
Specific Gravity for Sample 1 2.6
Theoretical maximum density at 25°C (77°F) 2592.5 kg/m^3