Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project ID: 993715 DEA: 010G1404 EFIS: 0116000129
QA Service Level: 1
DIST-CO-RTE-PM: 01-HUM-96,169-VAR
Work Description: HUM 96-169 5 Bridges Rail Upgrade (Do not include in project name: STRUCTURAL STEEL, CONCRETE BARRIER, POLYESTER CONCRETE OVERLAY)
Location Description: HUMBOLDT COUNTY ON ROUTES 96 AND 169 AT VARIOUS LOCATIONS (Bridge Nos. 04-0215, 04-0059, 04-0063, 04-0225, 04-0061)
Contractor Name: Steelhead Constructors JV
Contractor Address: P.O. Box 536, Palo Cedro, CA 96073
Resident Engineer: Efren Banuelos Structure Rep.: Laura Cangas
DIME Sample ID: 2024-07-16-11
TL Number from the TL Form:
Sample Submitted By Organization: CT HQ - FFS - Skid Testing
Sample Organization Contact: (916) 227-7287
Type of Sample: Quality Assurance
Type of Material: Roadway/Bridge Surface
Sample Taken Date: 07/16/2024
Date that the sample was received by the laboratory/organization performing the testing: 07/16/2024
The quantity of what the sample constitutes: Skid Testing
A brief description of the sample: Portable Skid Test
From where was the sample collected: Job Site
Laboratory sample identification:
Structure unique identifier:
Structure name: Bluff Creek Bridge
The fabricator/manufacturer/facility name: Job Site
Pavement Surface Type: Polyester Concrete
Type of Traffic Control Provided: Stationary Lane Closure
DIST-CO-RTE: 01-Hum-96
Direction of Travel: East
Post Mile:
Lanes to be Tested: Shoulder
Station:
DIME Test ID: 2024-07-16-11-1
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Verified Date: 07/16/2024
Date Tested: 07/16/2024
Submitted By Organization: CT HQ - FFS - Skid Testing
Organization Address: ,
Organization City:
Organization State:
Organization Zipcode:
Organization Email: steven.seifert@dot.ca.gov
Organization Phone: (916) 227-8588
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
|
Pavement or Bridge Deck?
|
Bridge Deck
|
|
Average Coefficient of Friction
|
0.46
|