Sample Record for 2024-07-01-37
Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project Information
Project ID: 993253 DEA: 033F0604 EFIS: 0312000052
QA Service Level: 1
DIST-CO-RTE-PM: 03-GLE-162-76.3/78.6
Work Description:
Location Description:
Contractor Name: GOLDEN STATE BRIDGE
Contractor Address: 3701 Mallard Drive, Benicia, CA 94510
Resident Engineer: Dustin Watts Structure Rep.: Matt Crete
Sample Information
DIME Sample ID: 2024-07-01-37
TL Number from the TL Form:
Sample Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Sample Organization Contact: (530) 329-6527
Type of Sample: Quality Assurance
Type of Material: SMTL TM5 - Couplers
Sample Taken Date: 07/01/2024
Date that the sample was received by the laboratory/organization performing the testing: 07/05/2024
The quantity of what the sample constitutes: 184
A brief description of the sample: HRC 500 510 Couplers Retest
From where was the sample collected: Job Site
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Pier 32
Material Information
Production or Authorization Testing: Production Testing
Service or Ultimate: Ultimate
Material Standard Code: ASTM A706
Material Grade: 60
Rebar Manufacturer: cmc
Coupler Manufacturer: HRC Gerdau
Intermediate Assembler or Fabricator:
Rebar Size: #14
Coupler Model: HRC 500/510
Coating Standards: Uncoated
Shape of Rebar: Straight
Rebar Hoop Diameter:
Rebar Hoop Fabricator:
Coupler Component Heat/Lot Number(s): 73130162, 73129190
Rebar Heat Number(s): 1066920, 1066914, 3125495
Rebar Size 2 :
Coupler Unique ID: TP-17-03
Test Results
Test 1 of 4
DIME Test ID: 2024-07-01-37-1
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 07/09/2024
Date Tested: 07/09/2024
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Ultimate - Ok Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested
|
1
|
Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 1 | | No. 14/43mm | 3 | -0.0322 | 2.25 | 217762 | 96783 | Ultimate - Ok Necking | aauvinen |
| |
UTM
|
400kip
|
Temperature
|
72.00 f
|
Halo ID
|
Large
|
Test 2 of 4
DIME Test ID: 2024-07-01-37-2
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 07/09/2024
Date Tested: 07/09/2024
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Ultimate - Ok Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested
|
1
|
Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 2 | | No. 14/43mm | 3 | 0 | 2.25 | 220501 | 98001 | Ultimate - Ok Necking | aauvinen |
| |
UTM
|
400kip
|
Temperature
|
72.00 f
|
Halo ID
|
|
Test 3 of 4
DIME Test ID: 2024-07-01-37-3
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 07/09/2024
Date Tested: 07/09/2024
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Ultimate - Ok Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested
|
1
|
Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 3 | | No. 14/43mm | 3 | 0 | 2.25 | 220461 | 97983 | Ultimate - Ok Necking | aauvinen |
| |
UTM
|
400kip
|
Temperature
|
72.00 f
|
Halo ID
|
|
Test 4 of 4
DIME Test ID: 2024-07-01-37-4
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 07/11/2024
Date Tested: 07/11/2024
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Ultimate - Ok Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested
|
1
|
Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 4 | | No. 14/43mm | 3 | 0 | 2.25 | 219963 | 97761 | Ultimate - Ok Necking | aauvinen |
| |
UTM
|
400kip
|
Temperature
|
72.00 f
|
Halo ID
|
|