Project Information

Project ID: 993905 DEA: 034H5814 EFIS: 0320000240 QA Service Level: 1
DIST-CO-RTE-PM: 03-SAC-5-27.6/29.5,30.4/34.3
Work Description: ROADWAY EXCAVATION, PLACE CL2 AB, HMA & RHMA, & MODIFY RAMP METERS.
Location Description: SACRAMENTO COUNTY IN AND NEAR SACRAMENTO FROM 0.5 MILES SOUTH OF ARENA BOULEVARD OVERCROSSING TO 0.4 MILES SOUTH OF 99/5 INTERCHANGE AND FROM 0.5 MILES NORTH OF THE 99/5 INTERCHANGE TO 0.4 MILE SOUTH OF THE YOLO COUNTY LINE
Contractor Name: DeSILVA GATES CONSTRUCTION
Contractor Address: 3855 N Freeway, Ste. 100, Sacramento, CA 95834
Resident Engineer: Hani Eissa Structure Rep.: Brent Bullard

Sample Information

DIME Sample ID: 2024-06-06-90
TL Number from the TL Form:
Sample Submitted By Organization: Blackburn Consulting
Sample Organization Contact: (916) 375-8706
Type of Sample: Quality Assurance
Type of Material: Hot Mix Asphalt
Sample Taken Date: 06/06/2024
Date that the sample was received by the laboratory/organization performing the testing: 06/07/2024
The quantity of what the sample constitutes: 2 Boxes
A brief description of the sample: 1/2" RWHM-O, PG 64-16
From where was the sample collected: Source
Laboratory sample identification: 3758
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: DeSilva Gates Marysville

Material Information

HMA Type: Not Applicable
HMA Grading: 1/2 inch
Lot number: 1
Sublot number: 6
HMA Mix Number:
Binder content (%):
Virgin binder PG:
Design binder PG:
Binder Supplier:
RAP content (%):
WMA Additives:
Antistrip type:

Test Results