Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project ID: 211068 DEA: 080N5504 EFIS: 0800020102
QA Service Level: 1
DIST-CO-RTE-PM: 08-SBD-40-R105.2/R106.5
Work Description: REPLACE THE LEFT WATSON WASH BRIDGE N0. 0805L
Location Description:
Contractor Name: MCM Construction
Contractor Address: PO Box 620, North Highlands, Ca 95660
Resident Engineer: Darcy Davis Structure Rep.: Leonard Romero
DIME Sample ID: 2016-11-02-1
TL Number from the TL Form: C970381
Sample Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Sample Organization Contact: (530) 329-6527
Type of Sample: Quality Assurance
Type of Material: SMTL TM5 - Welded Hoops
Sample Taken Date: 11/02/2016
Date that the sample was received by the laboratory/organization performing the testing: 11/04/2016
The quantity of what the sample constitutes: 12
A brief description of the sample: Flash Welded Rebar Hoops
From where was the sample collected: Fabricator
Laboratory sample identification: Unknown
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: TNT Cascade
Production or Authorization Testing: Production Testing
Service or Ultimate: Ultimate
Rebar Heat Number(s): 247416
Hoop Manufacturer Lot Number(s): 60
Material Standard Code: ASTM A706
Material Grade: 60
Rebar Size: 5
Diameter of Hoop: 1'-6"
Epoxy Coated: No
Epoxy Coating Color: NA
Rebar Manufacturer: Cascade
Welding Company: TNT Rebar
Coating Standards: Uncoated
Weld Type: Flash Welded
DIME Test ID: 2016-11-02-1-1
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 11/04/2016
Date Tested: 11/04/2016
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke; OK Necking
Test Result Compliance:
Additional Comments When Verified:
|
Number of Samples
|
1
|
| Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | | 1 | 47 | #5/16mm | 0.31 | 30100 | 97100 | Bar Broke | Brian |
| |
|
UTM
|
400KIP
|
|
Temperature
|
72 F
|
DIME Test ID: 2016-11-02-1-2
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 11/04/2016
Date Tested: 11/04/2016
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke; OK Necking
Test Result Compliance:
Additional Comments When Verified:
|
Number of Samples
|
1
|
| Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | | 2 | 47 | #5/16mm | 0.31 | 29610 | 95520 | Bar Broke | Brian |
| |
|
UTM
|
400KIP
|
|
Temperature
|
72 F
|
DIME Test ID: 2016-11-02-1-3
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 11/04/2016
Date Tested: 11/04/2016
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke; OK Necking
Test Result Compliance:
Additional Comments When Verified:
|
Number of Samples
|
1
|
| Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | | 3 | 47 | #5/16mm | 0.31 | 29710 | 95840 | Bar Broke | Brian |
| |
|
UTM
|
400KIP
|
|
Temperature
|
72 F
|
DIME Test ID: 2016-11-02-1-4
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 11/04/2016
Date Tested: 11/04/2016
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke; OK Necking
Test Result Compliance:
Additional Comments When Verified:
|
Number of Samples
|
1
|
| Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | | 1 | 51 | #5/16mm | 0.31 | 29420 | 94900 | Bar Broke | Brian |
| |
|
UTM
|
400KIP
|
|
Temperature
|
72 F
|
DIME Test ID: 2016-11-02-1-5
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 11/04/2016
Date Tested: 11/04/2016
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke in Heat Affected Area
Test Result Compliance:
Additional Comments When Verified:
|
Number of Samples
|
1
|
| Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | | 2 | 51 | #5/16mm | 0.31 | 29020 | 93610 | Bar Broke in Heat Affected Area | Brian |
| |
|
UTM
|
400KIP
|
|
Temperature
|
72 F
|
DIME Test ID: 2016-11-02-1-6
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 11/04/2016
Date Tested: 11/04/2016
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke; OK Necking
Test Result Compliance:
Additional Comments When Verified:
|
Number of Samples
|
1
|
| Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | | 3 | 51 | #5/16mm | 0.31 | 29700 | 95810 | Bar Broke | Brian |
| |
|
UTM
|
400KIP
|
|
Temperature
|
72 F
|
DIME Test ID: 2016-11-02-1-7
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 11/04/2016
Date Tested: 11/04/2016
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke; OK Necking
Test Result Compliance:
Additional Comments When Verified:
|
Number of Samples
|
1
|
| Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | | 4 | 51 | #5/16mm | 0.31 | 29570 | 95390 | Bar Broke | Brian |
| |
|
UTM
|
400KIP
|
|
Temperature
|
72 F
|
DIME Test ID: 2016-11-02-1-8
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 11/04/2016
Date Tested: 11/04/2016
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke; OK Necking
Test Result Compliance:
Additional Comments When Verified:
|
Number of Samples
|
1
|
| Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | | 1 | 56 | #5/16mm | 0.31 | 29440 | 94970 | Bar Broke | Brian |
| |
|
UTM
|
400KIP
|
|
Temperature
|
72 F
|
DIME Test ID: 2016-11-02-1-9
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 11/04/2016
Date Tested: 11/04/2016
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke; OK Necking
Test Result Compliance:
Additional Comments When Verified:
|
Number of Samples
|
1
|
| Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | | 2 | 56 | #5/16mm | 0.31 | 29530 | 95260 | Bar Broke | Brian |
| |
|
UTM
|
400KIP
|
|
Temperature
|
72 F
|
DIME Test ID: 2016-11-02-1-10
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 11/04/2016
Date Tested: 11/04/2016
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke; OK Necking
Test Result Compliance:
Additional Comments When Verified:
|
Number of Samples
|
1
|
| Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | | 3 | 56 | #5/16mm | 0.31 | 29580 | 95420 | Bar Broke | Brian |
| |
|
UTM
|
400KIP
|
|
Temperature
|
72 F
|