Print Report | Back to Sample Detail

Sample Record for 2024-06-04-75

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 994264 DEA: 010H20U4 EFIS: 0122000085 QA Service Level: 1
DIST-CO-RTE-PM: 01-HUM-101-77.3/79.5
Work Description: Project Name: 5th Street Combine (Description of Work: Minor Concrete, Modify Signal and HMA)
Location Description: HUMBOLDT COUNTY IN EUREKA AT VARIOUS LOCATIONS FROM MCCULLENS AVENUE TO 0.1 MILE NORTH OF V STREET AND WEST AVENUE NORTHBOUND
Contractor Name: S.T. Rhoades Construction, Inc.
Contractor Address: 8585 Commercial Way, Redding, CA 96002
Resident Engineer: Kristina Walker Structure Rep.: Unknown

Sample Information

DIME Sample ID: 2024-06-04-75
TL Number from the TL Form: NO TL 101
Sample Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Sample Organization Contact: (916) 227-7302
Type of Sample: Verification
Type of Material: Asphaltic Emulsion
Sample Taken Date: 06/04/2024
Date that the sample was received by the laboratory/organization performing the testing: 06/10/2024
The quantity of what the sample constitutes: 2 JUG
A brief description of the sample: MSE
From where was the sample collected: Source
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Western Emulsions

Material Information

Emulsion Grade: MSE
Lot Number:
Sub Lot:
Dilution Percentage Rate:

Test Results

Test 1 of 5

DIME Test ID: 2024-06-04-75-3
Test Method: AASHTO T59-22: Standard Method of Test for Emulsified Asphalts (Particle Charge Cationic Emulsified (Sec. 8))
Verified Date: 06/17/2024
Date Tested: 06/17/2024
Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (530) 713-6823
General Comments for this Test: PARTICLE CHARGE
Test Result Compliance: complies
Additional Comments When Verified:
Level of current used 8.0 mA
Electrode Type Positive

Test 2 of 5

DIME Test ID: 2024-06-04-75-4
Test Method: AASHTO T59-22: Standard Method of Test for Emulsified Asphalts (Emulsified Asphalt Residue Evap. (Sec. 7))
Verified Date: 06/17/2024
Date Tested: 06/12/2024
Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (530) 713-6823
General Comments for this Test: EVAP
Test Result Compliance: complies
Additional Comments When Verified:
How many beakers will be used to conduct the test? 2
Beaker 1 Residue 64 %
Beaker 2 Residue 64 %
Percentage of residue 64 %

Test 3 of 5

DIME Test ID: 2024-06-04-75-5
Test Method: AASHTO T59-22: Standard Method of Test for Emulsified Asphalts (Residue and Oil Distillate (Sec. 6))
Verified Date: 06/17/2024
Date Tested: 06/12/2024
Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (530) 713-6823
General Comments for this Test: DISTILLATION
Test Result Compliance: complies
Additional Comments When Verified:
What parameters are being calculated? Both
Is this a polymer-modified emulsion Yes
Percentage of oil distillate (by volume of emulsified asphalt) 0.5 %

Test 4 of 5

DIME Test ID: 2024-06-04-75-6
Test Method: AASHTO T49-15: Standard Method of Test for Penetration of Bituminous Materials
Verified Date: 06/17/2024
Date Tested: 06/17/2024
Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (530) 713-6823
General Comments for this Test: PEN
Test Result Compliance: complies
Additional Comments When Verified:
Was test performed on residue from distillation or evaporation? Distillation
Temperature (C) 25 C
Load (grams) 50 grams
Time (sec) 5 second
Average Penetration 70 dmm

Test 5 of 5

DIME Test ID: 2024-06-04-75-7
Test Method: AASHTO T53-18: Standard Method of Test for Softening Point of Bitumen (Ring-and-Ball Apparatus)
Verified Date: 06/17/2024
Date Tested: 06/17/2024
Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (530) 713-6823
General Comments for this Test: SOFTENING POINT
Test Result Compliance: complies
Additional Comments When Verified:
Thermometer used? 113C
Correction Needed? No
Bath Liquid Distilled Water
Mean Temperature 64 °C