Print Report | Back to Sample Detail

Sample Record for 2022-08-06-16

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 214680 DEA: 030F2854 EFIS: 0319000205 QA Service Level: 1
DIST-CO-RTE-PM: 03-SAC-99-7.1/9.4
Work Description: Construct the temporary bridge superstructures, adjacent paving and pave temporary alignment
Location Description:
Contractor Name: GRANITE CONSTRUCTION COMPANY
Contractor Address: 4001 Bradshaw Road, Sacramento, CA 95827
Resident Engineer: Masoud Saed Structure Rep.: Chau Ha

Sample Information

DIME Sample ID: 2022-08-06-16
TL Number from the TL Form:
Sample Submitted By Organization: CT HQ - Sacramento Hot Mix Asphalt Laboratory
Sample Organization Contact: (916) 227-7302
Type of Sample: Informational
Type of Material: Hot Mix Asphalt
Sample Taken Date: 08/06/2022
Date that the sample was received by the laboratory/organization performing the testing: 08/06/2022
The quantity of what the sample constitutes: 24 boxes
A brief description of the sample: 3/4" HMA-A
From where was the sample collected: Source
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Granite Construction - Bradshaw

Material Information

HMA Type: Type A HMA
HMA Grading: 3/4 inch
Lot number:
Sublot number:
HMA Mix Number:
Binder content (%):
Virgin binder PG:
Design binder PG:
Binder Supplier:
RAP content (%):
WMA Additives:
Antistrip type:

Test Results

Tests Assigned to this Sample

DIME Test IDTest MethodAssigned DateTest DateAssigned ByAssigned LabTest CommentsAssigned To
2022-08-06-16-2ASTM D8360-22: Standard Test Method for Determination of Rutting Tolerance Index of Asphalt Mixture Using the Ideal Rutting Test (Rutting Tolerance)06/10/2024Not scheduledBandy AhmedCT HQ - Sacramento Hot Mix Asphalt Laboratory
2022-08-06-16-3AASHTO T283-14: Standard Method of Test for Resistance of Compacted Asphalt Mixtures to Moisture-Induced Damage (Moisture Content)06/10/2024Not scheduledBandy AhmedCT HQ - Sacramento Hot Mix Asphalt Laboratory
2022-08-06-16-4CTM 389-19: Method of Test for Hamburg Wheel-Track Testing of Compacted Hot Mix Asphalt06/10/2024Not scheduledBandy AhmedCT HQ - Sacramento Hot Mix Asphalt Laboratory