Print Report | Back to Sample Detail

Sample Record for 2024-05-29-4

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 994872 DEA: 060X1604 EFIS: 0618000183 QA Service Level: 1
DIST-CO-RTE-PM: 06-KER-58-R64.4/67.3
Work Description: HMA (TYPE A), RHMA-G, JPCP, CRCP & HIGH SPEED WEIGH-IN-MOTION SYSTEM.
Location Description: KERN COUNTY NEAR EDISON FROM 0.2 MILE WEST OF TEJON HIGHWAY OVERCROSSING TO CALIENTE CREEK BRIDGE
Contractor Name: GRIFFITH COMPANY
Contractor Address: 1128 Carrier Parkway Avenue, Bakersfield, CA 93308
Resident Engineer: Mandeep Chahal Structure Rep.: Unknown

Sample Information

DIME Sample ID: 2024-05-29-4
TL Number from the TL Form:
Sample Submitted By Organization: CT D06 - Bakersfield Field Laboratory
Sample Organization Contact: 661-549-8281
Type of Sample: Acceptance
Type of Material: Concrete
Sample Taken Date: 05/29/2024
Date that the sample was received by the laboratory/organization performing the testing: 05/29/2024
The quantity of what the sample constitutes: 160 CY
A brief description of the sample: JPCP
From where was the sample collected: Job Site
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Holiday Rock - Bakersfield

Material Information

The concrete mix design number: 3FSH001
The truck number from where the sample was collected:
The batch plant ticket number from where the sample was collected: 16
Concrete batch plant:
The fabricator/manufacturer designation for the sample:
A detailed description of where the material sample was collected: Back of truck
Where the material sample would have been placed if not sampled:
From Lot No.:
Bag Lot No.:

Test Results

Test 1 of 5

DIME Test ID: 2024-05-29-4-1
Test Method: CTM 504-June 2010: Method of Test for Determining Air Content of Freshly Mixed Concrete by the Pressure Method
Verified Date: 05/29/2024
Date Tested: 05/29/2024
Submitted By Organization: CT D06 - Bakersfield Field Laboratory
Organization Address: 1824 Norris Road,
Organization City: Bakersfield
Organization State: CA
Organization Zipcode: 93308
Organization Email: kulwinder.rai@dot.ca.gov
Organization Phone: (661) 549-8281
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
Air Content 1.3 %

Test 2 of 5

DIME Test ID: 2024-05-29-4-2
Test Method: CTM 518-June 2010: Method of Test for Unit Weight of Fresh Concrete
Verified Date: 05/29/2024
Date Tested: 05/29/2024
Submitted By Organization: CT D06 - Bakersfield Field Laboratory
Organization Address: 1824 Norris Road,
Organization City: Bakersfield
Organization State: CA
Organization Zipcode: 93308
Organization Email: kulwinder.rai@dot.ca.gov
Organization Phone: (661) 549-8281
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
Unit weight of the concrete 146 lb/ft^3
Volume of the concrete 9.988 yd^3
Cement content 593.712 lb/yd^3

Test 3 of 5

DIME Test ID: 2024-05-29-4-3
Test Method: CTM 533-June 2010: Method of Test for Ball Penetration in Fresh Portland Cement Concrete
Verified Date: 05/29/2024
Date Tested: 05/29/2024
Submitted By Organization: CT D06 - Bakersfield Field Laboratory
Organization Address: 1824 Norris Road,
Organization City: Bakersfield
Organization State: CA
Organization Zipcode: 93308
Organization Email: kulwinder.rai@dot.ca.gov
Organization Phone: (661) 549-8281
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
Ball penetration in freshly mixed concrete (average) 2 inch

Test 4 of 5

DIME Test ID: 2024-05-29-4-4
Test Method: CTM 557-July 2012: Method of Test for Temperature of Freshly Mixed Portland Cement Concrete
Verified Date: 05/29/2024
Date Tested: 05/29/2024
Submitted By Organization: CT D06 - Bakersfield Field Laboratory
Organization Address: 1824 Norris Road,
Organization City: Bakersfield
Organization State: CA
Organization Zipcode: 93308
Organization Email: kulwinder.rai@dot.ca.gov
Organization Phone: (661) 549-8281
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
Temperature of the freshly mixed concrete 81 F

Test 5 of 5

DIME Test ID: 2024-05-29-4-5
Test Method: CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete Cylinders
Verified Date: 07/12/2024
Date Tested: 07/10/2024
Submitted By Organization: CT D06 - Bakersfield Field Laboratory
Organization Address: 1824 Norris Road,
Organization City: Bakersfield
Organization State: CA
Organization Zipcode: 93308
Organization Email: kulwinder.rai@dot.ca.gov
Organization Phone: (661) 549-8281
General Comments for this Test:
Test Result Compliance: does not comply
Additional Comments When Verified:
Unit system used? US Units
Number of specimens 3
Test performed With no density determined
Capped in accordance with? ASTM C617 - Sulfur Mortar Cap
Average diameter of cylinder 1 4.00 in
Average diameter of cylinder 2 4.00 in
Average diameter of cylinder 3 4.00 in
Cross sectional area of cylinder 1 12.57 in^2
Cross sectional area of cylinder 2 12.57 in^2
Cross sectional area of cylinder 3 12.57 in^2
Compressive strength (to nearest 10 psi) 5300 psi
Maximum load on cylinder 1 67800 lb
Maximum load on cylinder 2 64680 lb
Maximum load on cylinder 3 67340 lb
Compressive strength of cylinder 1 5393.8 psi
Type of fracture pattern of cylinder 1 4
Compressive strength of cylinder 2 5145.6 psi
Compressive strength of cylinder 3 5357.2 psi
Type of fracture pattern of cylinder 2 4
Type of fracture pattern of cylinder 3 1
Comment on any defect in either specimen or caps (Max 250 Characters) no data
Correction factor for cylinder 1 1
Correction factor for cylinder 2 1
Correction factor for cylinder 3 1
Age of specimen 42 days
Age of specimen in hours no data0 hours