Sample Record for 2024-05-06-44
Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project Information
Project ID: 214698 DEA: 120N8904 EFIS: 1214000130
QA Service Level: 1
DIST-CO-RTE-PM: 12-ORA-133-8.3/M9.3
Work Description: CONSTRUCT AUXILIARY LANE.
Location Description: ORANGE COUNTY IN IRVINE FROM ROUTE 133/405 SEPARATION TO IRVINE CENTER DRIVE OVERCROSSING
Contractor Name: SECURITY PAVING COMPANY, INC.
Contractor Address: 3200 Park Center Drive, Suite #200, Costa Mesa, CA 92626
Resident Engineer: Arezo Ghiam Structure Rep.: Michael Yee
Sample Information
DIME Sample ID: 2024-05-06-44
TL Number from the TL Form:
Sample Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Sample Organization Contact: (530) 329-6527
Type of Sample: Quality Assurance
Type of Material: SMTL TM5 - Couplers
Sample Taken Date: 05/06/2024
Date that the sample was received by the laboratory/organization performing the testing: 05/15/2024
The quantity of what the sample constitutes: 4
A brief description of the sample: #8 Zap Screwlok Coupler
From where was the sample collected: Job Site
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Vinton BarSplice
Material Information
Production or Authorization Testing: Production Testing
Service or Ultimate: Service
Material Standard Code: ASTM A706
Material Grade: 60
Rebar Manufacturer: Vinton
Coupler Manufacturer: BarSplice
Intermediate Assembler or Fabricator:
Rebar Size: #8
Coupler Model: Zap Screwlok Type 2
Coating Standards: Uncoated
Shape of Rebar: Straight
Rebar Hoop Diameter:
Rebar Hoop Fabricator:
Coupler Component Heat/Lot Number(s): A171693
Rebar Heat Number(s): 2321443
Rebar Size 2 :
Coupler Unique ID: SL-17-03
Test Results
Test 1 of 4
DIME Test ID: 2024-05-06-44-1
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 05/16/2024
Date Tested: 05/16/2024
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
|
Number of Samples Tested
|
1
|
| Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | | 1 | | No. 8/25mm | 1 | -0.0041 | 0.79 | 59195 | 74930 | Service Splice | aauvinen |
| |
|
UTM
|
400kip
|
|
Temperature
|
72.00 f
|
|
Halo ID
|
Small
|
Test 2 of 4
DIME Test ID: 2024-05-06-44-2
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 05/16/2024
Date Tested: 05/16/2024
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
|
Number of Samples Tested
|
1
|
| Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | | 2 | | No. 8/25mm | 1 | 0 | 0.79 | 59751 | 75634 | Service Splice | aauvinen |
| |
|
UTM
|
400kip
|
|
Temperature
|
72.00 f
|
|
Halo ID
|
|
Test 3 of 4
DIME Test ID: 2024-05-06-44-3
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 05/16/2024
Date Tested: 05/16/2024
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
|
Number of Samples Tested
|
1
|
| Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | | 3 | | No. 8/25mm | 1 | 0 | 0.79 | 65910 | 83430 | Service Splice | aauvinen |
| |
|
UTM
|
400kip
|
|
Temperature
|
72.00 f
|
|
Halo ID
|
|
Test 4 of 4
DIME Test ID: 2024-05-06-44-4
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 05/16/2024
Date Tested: 05/16/2024
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
|
Number of Samples Tested
|
1
|
| Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | | 4 | | No. 8/25mm | 1 | 0 | 0.79 | 61954 | 78423 | Service Splice | aauvinen |
| |
|
UTM
|
400kip
|
|
Temperature
|
72.00 f
|
|
Halo ID
|
|