Sample Record for 2024-05-08-5

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 995257 DEA: 09401004 EFIS: 0924000007 QA Service Level: 1
DIST-CO-RTE-PM: 09-INY-190-9.8-68.0
Work Description: Emergency Repair from Flood Damage to State Route 190 near Olancha, CA.
Location Description: State Route 190
Contractor Name: Unknown
Contractor Address: Unknown
Resident Engineer: Kris Raber Structure Rep.: Unknown

Sample Information

DIME Sample ID: 2024-05-08-5
TL Number from the TL Form:
Sample Submitted By Organization: CT D09 - Bishop Field Laboratory
Sample Organization Contact: (760) 872-5211
Type of Sample: Department Acceptance
Type of Material: Aggregate
Sample Taken Date: 05/08/2024
Date that the sample was received by the laboratory/organization performing the testing: 05/08/2024
The quantity of what the sample constitutes: 1 Box of HMA
A brief description of the sample: 3/4" HMA for Post Plant Gradation
From where was the sample collected: Source
Laboratory sample identification: 3888
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Granite 5 Bridges Plant

Material Information

Source Identification (SMARA, name of Pit or Job Site): 00-00-0000
The fabricator's/manufacturer's product name for the sample:
The fabricator/manufacturer designation for the sample:
The plant number:
A detailed description of where the material sample was collected: Windrow at Hot Plant
Where the material sample would have been placed if not sampled:
Primary Aggregate Nominal Size: 3/4 inch
The concrete mix design number:
Lot number:
Sublot number:
Aggregate Mix Number:

Test Results

Test 1 of 1

DIME Test ID: 2024-05-08-5-1
Test Method: AASHTO T30-19: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Verified Date: 05/09/2024
Date Tested: 05/08/2024
Submitted By Organization: CT D09 - Bishop Field Laboratory
Organization Address: 500 South Main Street,
Organization City: Bishop
Organization State: CA
Organization Zipcode: 93514
Organization Email: chris.talbot@dot.ca.gov
Organization Phone: (760) 872-0794
General Comments for this Test: HMA-03 Post Plant Gradation
Test Result Compliance: complies
Additional Comments When Verified:
Is an aggregate correction factor used? Yes
Cumulative percent passing the 2 in. sieve 100 %
Cumulative percent passing the 1 1/2 in. sieve 100 %
Cumulative percent passing the 1 in. sieve 100 %
Cumulative percent passing the 3/4 in. sieve 91 %
Cumulative percent passing the 1/2 in. sieve 82 %
Cumulative percent passing the 3/8 in. sieve 76 %
Cumulative percent passing the #4 sieve 53 %
Cumulative percent passing the #8 sieve 38 %
Cumulative percent passing the #16 sieve 28 %
Cumulative percent passing the #30 sieve 20 %
Cumulative percent passing the #50 sieve 13 %
Cumulative percent passing the #100 sieve 8 %
Cumulative percent passing the #200 sieve 4.4 %