Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project ID: 209698 DEA: 072332E4 EFIS: 0700000391 COOP: 0705187
QA Service Level: 2
DIST-CO-RTE-PM: 07-LA-I-5-45.4/54
Work Description: Addition of 14 miles of HOV lanes in both directions would extend existing carpool lanes on the I- 5 in San Fernando Valley to Santa Clarita Valley
Location Description: The I-5 North Capacity Enhancements Project focuses on improvements to the I-5 freeway from cities of Santa Clarita and Castaic, beginning at the SR-14 interchange to Parker Rd.
Contractor Name: Not yet Awarded
Contractor Address: Unknown
Resident Engineer: James Shih Structure Rep.: Chanh Tong
DIME Sample ID: 2023-08-30-102
TL Number from the TL Form:
Sample Submitted By Organization: Con-Fab California, LLC
Sample Organization Contact: (661) 630-7162
Type of Sample: Quality Control
Type of Material: Concrete
Sample Taken Date: 08/30/2023
Date that the sample was received by the laboratory/organization performing the testing: 08/31/2023
The quantity of what the sample constitutes: 11.6
A brief description of the sample: T-II/V Cement
From where was the sample collected: Manufacturer
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: ConFab California, LLC Shafter
The concrete mix design number: SCC-S8.5-0FG
The truck number from where the sample was collected:
The batch plant ticket number from where the sample was collected: 3731
Concrete batch plant:
The fabricator/manufacturer designation for the sample:
A detailed description of where the material sample was collected: Sampled from wheelbarrow collected from chute of ready mix truck
Where the material sample would have been placed if not sampled:
From Lot No.:
Bag Lot No.:
DIME Test ID: 2023-08-30-102-1
Test Method: ASTM C138-17a: Standard Test Method for Density (Unit Weight), Yield, and Air Content (Gravimetric) of Concrete
Verified Date: 06/11/2024
Date Tested: 08/30/2023
Submitted By Organization: Con-Fab California, LLC
Organization Address: 701 Golds Avenue,
Organization City: Shafter
Organization State: CA
Organization Zipcode: 93263
Organization Email: trevorl@confabca.com
Organization Phone: (661) 630-3281
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
Identification of concrete represented by the sample
|
I Girder
|
Volume of the measure
|
0.250 ft^3
|
Density of concrete
|
153.5 lb/ft^3
|
Yield of concrete
|
no data
|
Relative yield of the batch
|
no data
|
Cement content
|
no data
|
Air content
|
no data
|
DIME Test ID: 2023-08-30-102-2
Test Method: ASTM C1064-17: Standard Test Method for Temperature of Freshly Mixed Hydraulic-Cement Concrete
Verified Date: 06/11/2024
Date Tested: 08/30/2023
Submitted By Organization: Con-Fab California, LLC
Organization Address: 701 Golds Avenue,
Organization City: Shafter
Organization State: CA
Organization Zipcode: 93263
Organization Email: trevorl@confabca.com
Organization Phone: (661) 630-3281
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
DIME Test ID: 2023-08-30-102-3
Test Method: ASTM C1611-21: Standard Test Method for Slump Flow of Self-Consolidating Concrete
Verified Date: 06/11/2024
Date Tested: 08/30/2023
Submitted By Organization: Con-Fab California, LLC
Organization Address: 701 Golds Avenue,
Organization City: Shafter
Organization State: CA
Organization Zipcode: 93263
Organization Email: trevorl@confabca.com
Organization Phone: (661) 630-3281
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
What unit system is used for measurements?
|
inches
|
Slump Flow
|
22 in
|
Filling the mold procedure
|
Filling Procedure B (Inverted Mold)
|
Diameter 1
|
22 in
|
Diameter 2
|
22 in
|
Visual Stability Index
|
no data0
|
DIME Test ID: 2023-08-30-102-4
Test Method: CTM TEMP1-16: Test Method for Monitoring Precast Concrete Curing Temperature (Curing temperature)
Verified Date: 06/11/2024
Date Tested: 08/30/2023
Submitted By Organization: Con-Fab California, LLC
Organization Address: 701 Golds Avenue,
Organization City: Shafter
Organization State: CA
Organization Zipcode: 93263
Organization Email: trevorl@confabca.com
Organization Phone: (661) 630-3281
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
Precast Maximum Curing Temperature
|
152 °F
|
DIME Test ID: 2023-08-30-102-5
Test Method: ASTM C231-17a: Standard Test Method for Air Content of Freshly Mixed Concrete by the Pressure Method
Verified Date: 06/11/2024
Date Tested: 08/30/2023
Submitted By Organization: Con-Fab California, LLC
Organization Address: 701 Golds Avenue,
Organization City: Shafter
Organization State: CA
Organization Zipcode: 93263
Organization Email: trevorl@confabca.com
Organization Phone: (661) 630-3281
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified: