Print Report | Back to Sample Detail

Sample Record for 2024-04-02-1

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 993141 DEA: 060V1204 EFIS: 0616000207 QA Service Level: 1
DIST-CO-RTE-PM: 06-MAD-99-R6.9/R7.6
Work Description: Cottonwood Creek Bridge Replacement - REPLACE BRIDGES AND CONSTRUCT RETAINING WALLS.
Location Description: MADERA COUNTY NEAR MADERA FROM 0.4 MILE SOUTH OF COTTONWOOD CREEK BRIDGE TO 0.1 MILE NORTH OF AVENUE 12 OVERCROSSING
Contractor Name: Security Paving Company, Inc.
Contractor Address: 3075 Townsgate Road, Westlake Village CA 91361
Resident Engineer: Din Dadawalla Structure Rep.: Ye Yang

Sample Information

DIME Sample ID: 2024-04-02-1
TL Number from the TL Form:
Sample Submitted By Organization: CT HQ - FFS - Skid Testing
Sample Organization Contact: (916) 227-7287
Type of Sample: Department Acceptance
Type of Material: Roadway/Bridge Surface
Sample Taken Date: 04/02/2024
Date that the sample was received by the laboratory/organization performing the testing: 04/02/2024
The quantity of what the sample constitutes: JOB SITE
A brief description of the sample: BRIDGE
From where was the sample collected: Job Site
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: JOB SITE

Material Information

Pavement Surface Type: PCC (Portland Cement Concrete)
Type of Traffic Control Provided: Behind K-Rail/Barrier
DIST-CO-RTE:
Direction of Travel:
Post Mile:
Lanes to be Tested: Shoulder
Station:

Test Results

Test 1 of 6

DIME Test ID: 2024-04-02-1-1
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Verified Date: 04/23/2024
Date Tested: 04/16/2024
Submitted By Organization: CT HQ - FFS - Skid Testing
Organization Address: ,
Organization City:
Organization State:
Organization Zipcode:
Organization Email: steven.seifert@dot.ca.gov
Organization Phone: (916) 227-8588
General Comments for this Test: COTTONWOOD CREEK BRIDGE SB
Test Result Compliance: complies
Additional Comments When Verified:
Pavement or Bridge Deck? Bridge Deck
Average Coefficient of Friction 0.40

Test 2 of 6

DIME Test ID: 2024-04-02-1-2
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Verified Date: 04/23/2024
Date Tested: 04/16/2024
Submitted By Organization: CT HQ - FFS - Skid Testing
Organization Address: ,
Organization City:
Organization State:
Organization Zipcode:
Organization Email: steven.seifert@dot.ca.gov
Organization Phone: (916) 227-8588
General Comments for this Test: COTTONWOOD CREEK BRIDGE APPROACH SB
Test Result Compliance: complies
Additional Comments When Verified:
Pavement or Bridge Deck? Bridge Deck
Average Coefficient of Friction 0.37

Test 3 of 6

DIME Test ID: 2024-04-02-1-3
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Verified Date: 04/23/2024
Date Tested: 04/16/2024
Submitted By Organization: CT HQ - FFS - Skid Testing
Organization Address: ,
Organization City:
Organization State:
Organization Zipcode:
Organization Email: steven.seifert@dot.ca.gov
Organization Phone: (916) 227-8588
General Comments for this Test: COTTONWOOD CREEK BRIDGE DEPARTURE SB
Test Result Compliance: complies
Additional Comments When Verified:
Pavement or Bridge Deck? Bridge Deck
Average Coefficient of Friction 0.38

Test 4 of 6

DIME Test ID: 2024-04-02-1-4
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Verified Date: 04/23/2024
Date Tested: 04/16/2024
Submitted By Organization: CT HQ - FFS - Skid Testing
Organization Address: ,
Organization City:
Organization State:
Organization Zipcode:
Organization Email: steven.seifert@dot.ca.gov
Organization Phone: (916) 227-8588
General Comments for this Test: COTTONWOOD CREEK BRIDGE APPROACH NB
Test Result Compliance: complies
Additional Comments When Verified:
Pavement or Bridge Deck? Bridge Deck
Average Coefficient of Friction 0.37

Test 5 of 6

DIME Test ID: 2024-04-02-1-5
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Verified Date: 04/23/2024
Date Tested: 04/16/2024
Submitted By Organization: CT HQ - FFS - Skid Testing
Organization Address: ,
Organization City:
Organization State:
Organization Zipcode:
Organization Email: steven.seifert@dot.ca.gov
Organization Phone: (916) 227-8588
General Comments for this Test: COTTONWOOD CREEK BRIDGE NB
Test Result Compliance: complies
Additional Comments When Verified:
Pavement or Bridge Deck? Bridge Deck
Average Coefficient of Friction 0.38

Test 6 of 6

DIME Test ID: 2024-04-02-1-6
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Verified Date: 04/23/2024
Date Tested: 04/16/2024
Submitted By Organization: CT HQ - FFS - Skid Testing
Organization Address: ,
Organization City:
Organization State:
Organization Zipcode:
Organization Email: steven.seifert@dot.ca.gov
Organization Phone: (916) 227-8588
General Comments for this Test: COTTONWOOD CREEK BRIDGE DEPARTURE NB
Test Result Compliance: complies
Additional Comments When Verified:
Pavement or Bridge Deck? Bridge Deck
Average Coefficient of Friction 0.38