Sample Record for 2023-12-21-18
Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project Information
Project ID: 993781 DEA: 07322404 EFIS: 0716000055
QA Service Level: 1
DIST-CO-RTE-PM: 07-LA-134-R12.6,R12.9
Work Description: REMOVE BRIDGE RAILING AND PLACE CONCRETE BARRIER.
Location Description: LOS ANGELES COUNTY IN PASADENA AT ARROYO SECO BRIDGE AND AT THE ORANGE GROVE BOULEVARD ON-RAMP OVERCROSSING
Contractor Name: BEADOR CONSTRUCTION
Contractor Address: 26320 LESTER CIRCLE, CORONA, CA 92883
Resident Engineer: Sam Toutounchian Structure Rep.: Ryan Vantine
Sample Information
DIME Sample ID: 2023-12-21-18
TL Number from the TL Form:
Sample Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Sample Organization Contact: (530) 329-6527
Type of Sample: Quality Assurance
Type of Material: SMTL TM5 - Couplers
Sample Taken Date: 12/21/2023
Date that the sample was received by the laboratory/organization performing the testing: 01/05/2024
The quantity of what the sample constitutes: 8
A brief description of the sample: #5 DBL Barrel Zap Screwlok
From where was the sample collected: Job Site
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: BarSplice CMC
Material Information
Production or Authorization Testing: Production Testing
Service or Ultimate: Service
Material Standard Code: ASTM A706
Material Grade: 60
Rebar Manufacturer: CMC
Coupler Manufacturer: BarSplice
Intermediate Assembler or Fabricator:
Rebar Size: #5
Coupler Model: DBL BRL Zap Screwlok
Coating Standards: Uncoated
Shape of Rebar: Straight
Rebar Hoop Diameter:
Rebar Hoop Fabricator:
Coupler Component Heat/Lot Number(s): 30802
Rebar Heat Number(s): 4132739
Rebar Size 2 :
Coupler Unique ID: SB-17-02
Test Results
Test 1 of 8
DIME Test ID: 2023-12-21-18-1
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 01/04/2024
Date Tested: 01/04/2024
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
|
Number of Samples Tested
|
1
|
| Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | | 1 | | No. 5/16mm | 11 | 0 | 0.31 | 28312 | 91330 | Service Splice | aauvinen |
| |
|
UTM
|
400kip
|
|
Temperature
|
72.00 f
|
|
Halo ID
|
|
Test 2 of 8
DIME Test ID: 2023-12-21-18-2
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 01/04/2024
Date Tested: 01/04/2024
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
|
Number of Samples Tested
|
1
|
| Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | | 2 | | No. 5/16mm | 11 | 0 | 0.31 | 29125 | 93952 | Service Splice | aauvinen |
| |
|
UTM
|
400kip
|
|
Temperature
|
72.00 f
|
|
Halo ID
|
|
Test 3 of 8
DIME Test ID: 2023-12-21-18-3
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 01/04/2024
Date Tested: 01/04/2024
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
|
Number of Samples Tested
|
1
|
| Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | | 3 | | No. 5/16mm | 11 | 0 | 0.31 | 29115 | 93919 | Service Splice | aauvinen |
| |
|
UTM
|
400kip
|
|
Temperature
|
72.00 f
|
|
Halo ID
|
|
Test 4 of 8
DIME Test ID: 2023-12-21-18-4
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 01/04/2024
Date Tested: 01/04/2024
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
|
Number of Samples Tested
|
1
|
| Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | | 4 | | No. 5/16mm | 11 | 0 | 0.31 | 28214 | 91014 | Service Splice | aauvinen |
| |
|
UTM
|
400kip
|
|
Temperature
|
72.00 f
|
|
Halo ID
|
|
Test 5 of 8
DIME Test ID: 2023-12-21-18-5
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 01/05/2024
Date Tested: 01/05/2024
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
|
Number of Samples Tested
|
1
|
| Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | | 5 | 0 | 5 | 13 | 0 | 0.31 | 29091 | 93842 | Service Splice | aauvinen |
| |
|
UTM
|
400KIP
|
|
Temperature
|
72.00 f
|
|
Halo ID
|
NA
|
Test 6 of 8
DIME Test ID: 2023-12-21-18-6
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 01/05/2024
Date Tested: 01/05/2024
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
|
Number of Samples Tested
|
1
|
| Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | | 6 | 0 | 5 | 13 | 0 | 0.31 | 29221 | 94262 | Service Splice | aauvinen |
| |
|
UTM
|
400KIP
|
|
Temperature
|
72.00 f
|
|
Halo ID
|
NA
|
Test 7 of 8
DIME Test ID: 2023-12-21-18-7
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 01/05/2024
Date Tested: 01/05/2024
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
|
Number of Samples Tested
|
1
|
| Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | | 7 | 0 | 5 | 13 | 0 | 0.31 | 29178 | 94123 | Service Splice | aauvinen |
| |
|
UTM
|
400KIP
|
|
Temperature
|
72.00 f
|
|
Halo ID
|
NA
|
Test 8 of 8
DIME Test ID: 2023-12-21-18-8
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 01/05/2024
Date Tested: 01/05/2024
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
|
Number of Samples Tested
|
1
|
| Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | | 8 | 0 | 5 | 13 | 0 | 0.31 | 29269 | 94418 | Service Splice | aauvinen |
| |
|
UTM
|
400KIP
|
|
Temperature
|
72.00 f
|
|
Halo ID
|
NA
|