Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project ID: 214135 DEA: 09213404 EFIS: 0900000030
QA Service Level: 1
DIST-CO-RTE-PM: 09-INY-395-29.9/41.8
Work Description: ROADWAY EXCAVATION, PLACE HMA (TYPE A), AND ALTERNATIVE PIPE CULVERT.
Location Description: INYO COUNTY NEAR OLANCHA AND CARTAGO FROM 1.4 MILES SOUTH OF LOS ANGELES AQUEDUCT BRIDGE TO 0.2 MILE SOUTH OF ASH CREEK BRIDGE
Contractor Name: FISHER SAND & GRAVEL CO.
Contractor Address: 1302 W DRIVERS WAY, TEPE, AZ. 85284
Resident Engineer: Kris Raber Structure Rep.: Sheila Reyes
DIME Sample ID: 2023-11-08-101
TL Number from the TL Form:
Sample Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Sample Organization Contact: 213-792-4794
Type of Sample: Verification
Type of Material: Asphalt Binder
Sample Taken Date: 11/08/2023
Date that the sample was received by the laboratory/organization performing the testing: 12/18/2023
The quantity of what the sample constitutes: 1 Can
A brief description of the sample: Asphalt Binder Sample
From where was the sample collected: Source
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Tank at Plant
Performance Grade: PG 70-10
Modified:
Lot number:
Sublot number:
Tank number:
Time of sample:
HMA Supplier:
Certified Asphalt Supplier: San Joaquin Refinery - Bakersfield CA
Multigrade: No
Multigrade Type:
Asphalt Binder Mix Number:
DIME Test ID: 2023-11-08-101-1
Test Method: AASHTO T228-22: Standard Method of Test for Specific Gravity of Semi-Solid Asphalt Materials (Specific Gravity)
Verified Date: 12/26/2023
Date Tested: 12/22/2023
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: not applicable
Additional Comments When Verified:
DIME Test ID: 2023-11-08-101-2
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Verified Date: 12/26/2023
Date Tested: 12/22/2023
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test: 0.037+0.006= 0.043
Test Result Compliance: complies
Additional Comments When Verified:
Is mass change based on one or two containers?
|
Two
|
Any material loss from containers during heating process/testing?
|
No
|
Mass of empty container #1
|
170.719 grams
|
Mass of empty container #2
|
172.893 grams
|
Mass of container #1 before test (m1i)
|
205.869 grams
|
Mass of container #2 before test (m2i)
|
208.049 grams
|
Mass of container #1 after test (m1f)
|
205.883 grams
|
Mass of container #2 after test (m2f)
|
208.061 grams
|
Average mass change
|
0.037 percent
|
DIME Test ID: 2023-11-08-101-3
Test Method: AASHTO T315-12: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 12/26/2023
Date Tested: 12/22/2023
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Phase
|
Original binder
|
Phase Angle (δ) (for the 10 cycles)
|
89.5 degree
|
Dynamic Shear, G*/sin(δ)
|
1.27 kPa
|
(G*) x sin(δ)=
|
no data
|
DIME Test ID: 2023-11-08-101-4
Test Method: AASHTO T315-16: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 12/26/2023
Date Tested: 12/22/2023
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Phase
|
RTFO residue
|
Test Plate Diameter
|
25 mm
|
Phase Angle (δ) (for the 10 cycles)
|
88.7 degree
|
Dynamic Shear, G*/sin(δ)
|
2.42 kPa
|
DIME Test ID: 2023-11-08-101-5
Test Method: AASHTO T316-17: Standard Method of Test for Viscosity Determination of Asphalt Binder Using Rotational Viscometer
Verified Date: 12/26/2023
Date Tested: 12/22/2023
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Is viscosity reading in cP/Pa-s?
|
Pa-s
|
Time of test
|
9:02 HH:MM
|
Test Temperature
|
135 C
|
Speed
|
100 rpm
|
Spindle size
|
21 in
|
Torque
|
78.1 %
|
Viscosity reading #1 (A)
|
0.388 Pa-s
|
Viscosity reading #2 (B)
|
0.391 Pa-s
|
Viscosity reading #3 (C)
|
0.392 Pa-s
|
Average viscosity
|
0.39 Pa-s
|
DIME Test ID: 2023-11-08-101-6
Test Method: AASHTO T44-18: Standard Method of Test for Solubility of Bituminous Materials
Verified Date: 12/26/2023
Date Tested: 12/22/2023
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Was test performed on residue from distillation or evaporation?
|
NA
|
Soluble, percent
|
99.9 %
|
Insoluble, percent
|
0.1 %
|
DIME Test ID: 2023-11-08-101-7
Test Method: AASHTO T313-22: Standard Method of Test for Determining the Flexural Creep Stiffness of Asphalt Binder Using the Bending Beam Rheometer (BBR)
Verified Date: 01/18/2024
Date Tested: 01/16/2024
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Minimum test bath temperature at 240 s
|
no data
|
Maximum test bath temperature at 240 s
|
no data
|
Time of test load application
|
no data HH:MM:SS
|
File name of test data
|
no data
|
Time beam in bath
|
no data
|
Time test started
|
no data HH:MM:SS
|
Flags issued by software during test
|
no data
|
Correlation coefficient (R²)
|
no data0
|
Regression coefficient a
|
no data
|
Regression coefficient b
|
no data
|
Regression coefficient c
|
no data
|
Load at time 0.0
|
no data0 mN
|
Deflection at time 0.0 s
|
no data0 µm
|
Load at time 0.5 s
|
no data0 mN
|
Deflection at time 0.5 s
|
no data0 µm
|
Load at 60.0 s
|
no data0 mN
|
Beam deflection 60.0 s
|
no data0 µm
|
Measured Stiffness Modulus 60.0 s
|
192.199 mPa
|
Estimated Stiffness Modulus 60.0 s
|
no data
|
Difference between stiffness moduli 60.0 s
|
no data
|
Estimated m-value 60.0 s
|
0.382
|
DIME Test ID: 2023-11-08-101-8
Test Method: AASHTO T315-20: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 01/18/2024
Date Tested: 01/16/2024
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Phase
|
PAV residue
|
Test Plate Diameter
|
8 mm
|
Phase Angle (δ) (for the 10 cycles)
|
64.7 degree
|
(G*) x sin(δ)=
|
4170 kPa
|