Print Report | Back to Sample Detail

Sample Record for 2023-12-01-32

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 214336 DEA: 07302404 EFIS: 0713000488 QA Service Level: 1
DIST-CO-RTE-PM: 07-VEN-101-37/40
Work Description: PADRE JUAN REHAB
Location Description: VEN 101
Contractor Name: GRANITE CONSTRUCTION COMPANY
Contractor Address: 4820 McGrath Street, Suite 101, Ventura, CA 93003
Resident Engineer: Alfred Ira Structure Rep.: Unknown

Sample Information

DIME Sample ID: 2023-12-01-32
TL Number from the TL Form: 019376
Sample Submitted By Organization: CT D07 - Materials Field Laboratory, Unit 1953
Sample Organization Contact: (213) 817-0387
Type of Sample: Department Acceptance
Type of Material: Hot Mix Asphalt
Sample Taken Date: 12/01/2023
Date that the sample was received by the laboratory/organization performing the testing: 12/06/2023
The quantity of what the sample constitutes: 750 Tons
A brief description of the sample: 3/8" HMA DIKE 2641
From where was the sample collected: Manufacturer
Laboratory sample identification: 23-606
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Granite Santa Paula

Material Information

HMA Type: Type A HMA
HMA Grading: 3/8 inch
Lot number:
Sublot number:
HMA Mix Number: 2641

Test Results

Test 1 of 1

DIME Test ID: 2023-12-01-32-1
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Verified Date: 12/11/2023
Date Tested: 12/06/2023
Submitted By Organization: CT D07 - Materials Field Laboratory, Unit 1953
Organization Address: 1940 South Workman Mill Road,
Organization City: Whittier
Organization State: CA
Organization Zipcode: 90601
Organization Email: chad.chotibhongs@dot.ca.gov
Organization Phone: (213) 817-0387
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
What temperature unit is used? Celsius
Test procedure used? Method A
Mass of the specimen basket assembly 4020.5 g
Mass of the specimen and specimen basket assembly prior to ignition 5554.6 g
Mass of HMA Sample prior to ignition 1534.1 g
Corrected Asphalt Binder Content 6.75 %
Mass Loss 103.5 g
Mass of aggregate remaining after ignition 1430.6 g
Correction Factor (Percent by mass of HMA Specimen) no data0 %
Moisture Content no data0 %
Temperature Compensation Factor no data0 %
Test Temperature 538 C