Sample Record for 2023-10-20-47
Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project Information
Project ID: 994812 DEA: 042K7204 EFIS: 0417000014
QA Service Level: 1
DIST-CO-RTE-PM: 04-CC-4-R14.3/24.3
Work Description: Pvmt rehabilitation, slab repl, ADA curb ramp and install guardrail.
Location Description: On state highway in Contra Costa County in and near Concord and Pittsburg from 0.3 miles east of Peralta Road Undercrossing to Loveridge Road Overcrossing.
Contractor Name: O.C. Jones & Sons, Inc. (Victor Babbitt)
Contractor Address: 1520 Fourth Street, Berkeley, CA 94710
Resident Engineer: Rabi Mukherjee Structure Rep.: Unknown
Sample Information
DIME Sample ID: 2023-10-20-47
TL Number from the TL Form:
Sample Submitted By Organization: CT D04 - Concord Field Laboratory
Sample Organization Contact: (510) 714-7019
Type of Sample: Quality Assurance
Type of Material: Aggregate
Sample Taken Date: 10/20/2023
Date that the sample was received by the laboratory/organization performing the testing: 10/30/2023
The quantity of what the sample constitutes: LOT 2 SUBLOT 2
A brief description of the sample: 3/4-INCH RHMA-G
From where was the sample collected: Source
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Teichert Vernalis Drier Drum Plant
Material Information
Source Identification (SMARA, name of Pit or Job Site): 91-39-0041
The fabricator's/manufacturer's product name for the sample:
The fabricator/manufacturer designation for the sample:
The plant number:
A detailed description of where the material sample was collected: Sample Pick up from Plant
Where the material sample would have been placed if not sampled:
Primary Aggregate Nominal Size: 3/4 inch
The concrete mix design number:
Lot number: 2
Sublot number: 2
Aggregate Mix Number: 30240532510A
Test Results
Test 1 of 2
DIME Test ID: 2023-10-20-47-11
Test Method: AASHTO T176-08: Standard Method of Test for Plastic Fines in Graded Aggregates and Soils by Use of the Sand Equivalent Test (Sand Equivalent)
Verified Date: 11/17/2023
Date Tested: 10/30/2023
Submitted By Organization: CT D04 - Concord Field Laboratory
Organization Address: 2525 Stanwell Drive, Suite 100,
Organization City: Concord
Organization State: CA
Organization Zipcode: 94520
Organization Email: gurind.joshi@dot.ca.gov
Organization Phone: (510) 714-7019
General Comments for this Test: LOT 2 SUBLOT 2
Teichert Vernalis Drier Drum Plant
Test Result Compliance: complies
Additional Comments When Verified:
Test 2 of 2
DIME Test ID: 2023-10-20-47-12
Test Method: AASHTO T27-14: Standard Method of Test for Sieve Analysis of Fine and Coarse Aggregates (Sieve Analysis)
Verified Date: 11/17/2023
Date Tested: 10/30/2023
Submitted By Organization: CT D04 - Concord Field Laboratory
Organization Address: 2525 Stanwell Drive, Suite 100,
Organization City: Concord
Organization State: CA
Organization Zipcode: 94520
Organization Email: gurind.joshi@dot.ca.gov
Organization Phone: (510) 714-7019
General Comments for this Test: LOT 2 SUBLOT 2
Teichert Vernalis Drier Drum Plant
Test Result Compliance: complies
Additional Comments When Verified:
|
What type of gradation is being tested?
|
Combined Gradation
|
|
Cumulative percent passing the 2 in. sieve
|
no data0 %
|
|
Cumulative percent passing the 1 1/2 in. sieve
|
no data0 %
|
|
Cumulative percent passing the 1 in. sieve
|
100 %
|
|
Cumulative percent passing the 3/4 in. sieve
|
99 %
|
|
Cumulative percent passing the 1/2 in. sieve
|
88 %
|
|
Cumulative percent passing the 3/8 in. sieve
|
67 %
|
|
Cumulative percent passing the #4 sieve
|
28 %
|
|
Cumulative percent passing the #8 sieve
|
13 %
|
|
Cumulative percent passing the #16 sieve
|
7 %
|
|
Cumulative percent passing the #30 sieve
|
4 %
|
|
Cumulative percent passing the #50 sieve
|
3 %
|
|
Cumulative percent passing the #100 sieve
|
1 %
|
|
Cumulative percent passing the #200 sieve
|
1 %
|
Tests Assigned to this Sample
| DIME Test ID | Test Method | Assigned Date | Test Date | Assigned By | Assigned Lab | Test Comments | Assigned To |
| 2023-10-20-47-1 | AASHTO T176-08: Standard Method of Test for Plastic Fines in Graded Aggregates and Soils by Use of the Sand Equivalent Test (Sand Equivalent) | 11/17/2023 | Not scheduled | IGNACIO ARECHIGA | CT D04 - Concord Field Laboratory | LOT 1 SUBLOT 12
Teichert Vernalis Drier Drum Plant | |
| 2023-10-20-47-2 | AASHTO T27-14: Standard Method of Test for Sieve Analysis of Fine and Coarse Aggregates (Sieve Analysis) | 11/17/2023 | Not scheduled | IGNACIO ARECHIGA | CT D04 - Concord Field Laboratory | LOT 1 SUBLOT 12
Teichert Vernalis Drier Drum Plant | |
| 2023-10-20-47-3 | AASHTO T176-08: Standard Method of Test for Plastic Fines in Graded Aggregates and Soils by Use of the Sand Equivalent Test (Sand Equivalent) | 11/17/2023 | Not scheduled | IGNACIO ARECHIGA | CT D04 - Concord Field Laboratory | LOT 1 SUBLOT 19
Teichert Vernalis Drier Drum Plant | |
| 2023-10-20-47-4 | AASHTO T27-14: Standard Method of Test for Sieve Analysis of Fine and Coarse Aggregates (Sieve Analysis) | 11/17/2023 | Not scheduled | IGNACIO ARECHIGA | CT D04 - Concord Field Laboratory | LOT 1 SUBLOT 19
Teichert Vernalis Drier Drum Plant | |
| 2023-10-20-47-5 | AASHTO T176-08: Standard Method of Test for Plastic Fines in Graded Aggregates and Soils by Use of the Sand Equivalent Test (Sand Equivalent) | 11/17/2023 | Not scheduled | IGNACIO ARECHIGA | CT D04 - Concord Field Laboratory | LOT 1 SUBLOT 15
Teichert Vernalis Drier Drum Plant | |
| 2023-10-20-47-6 | AASHTO T27-14: Standard Method of Test for Sieve Analysis of Fine and Coarse Aggregates (Sieve Analysis) | 11/17/2023 | Not scheduled | IGNACIO ARECHIGA | CT D04 - Concord Field Laboratory | LOT 1 SUBLOT 15
Teichert Vernalis Drier Drum Plant | |
| 2023-10-20-47-7 | AASHTO T176-08: Standard Method of Test for Plastic Fines in Graded Aggregates and Soils by Use of the Sand Equivalent Test (Sand Equivalent) | 11/17/2023 | Not scheduled | IGNACIO ARECHIGA | CT D04 - Concord Field Laboratory | LOT 1 SUBLOT 13
Teichert Vernalis Drier Drum Plant | |
| 2023-10-20-47-8 | AASHTO T27-14: Standard Method of Test for Sieve Analysis of Fine and Coarse Aggregates (Sieve Analysis) | 11/17/2023 | Not scheduled | IGNACIO ARECHIGA | CT D04 - Concord Field Laboratory | LOT 1 SUBLOT 13
Teichert Vernalis Drier Drum Plant | |
| 2023-10-20-47-9 | AASHTO T176-08: Standard Method of Test for Plastic Fines in Graded Aggregates and Soils by Use of the Sand Equivalent Test (Sand Equivalent) | 11/17/2023 | Not scheduled | IGNACIO ARECHIGA | CT D04 - Concord Field Laboratory | LOT 2 SUBLOT 4
Teichert Vernalis Drier Drum Plant | |
| 2023-10-20-47-10 | AASHTO T27-14: Standard Method of Test for Sieve Analysis of Fine and Coarse Aggregates (Sieve Analysis) | 11/17/2023 | Not scheduled | IGNACIO ARECHIGA | CT D04 - Concord Field Laboratory | LOT 2 SUBLOT 4
Teichert Vernalis Drier Drum Plant | |
91523915249152591526915279152891529915309153191532