| 2023-10-04-71-1 | AASHTO T209-22: Standard Method of Test for Theoretical Maximum Specific Gravity (Gmm) and Density of Asphalt Mixtures (Maximum Specific Gravity) | 11/13/2023 | Not scheduled | IGNACIO ARECHIGA | CT D04 - Concord Field Laboratory | Teichert Vernalis Drier Drum Plant
LOT 1 SUBLOT 18
Theoretical Maximum Density=2.386 | |
| 2023-10-04-71-2 | AASHTO T275-07r12: Standard Method of Test for Bulk Specific Gravity (Gmb) of Compacted Asphalt Mixtures Using Paraffin-Coated Specimens (Bulk Specific Gravity) | 11/13/2023 | Not scheduled | IGNACIO ARECHIGA | CT D04 - Concord Field Laboratory | Teichert Vernalis Drier Drum Plant
LOT 1 SUBLOT 18
Core 1-18A=94.7%
Core 1-18B=94.5%
Core 1-18C=94.5%
ALL CORES PASSED | |
| 2023-10-04-71-3 | AASHTO T209-22: Standard Method of Test for Theoretical Maximum Specific Gravity (Gmm) and Density of Asphalt Mixtures (Maximum Specific Gravity) | 11/13/2023 | Not scheduled | IGNACIO ARECHIGA | CT D04 - Concord Field Laboratory | LOT 1 SUBLOT 17
Teichert Vernalis Drier Drum Plant
Theoretical Maximum Density=2.397 | |
| 2023-10-04-71-4 | AASHTO T275-07r12: Standard Method of Test for Bulk Specific Gravity (Gmb) of Compacted Asphalt Mixtures Using Paraffin-Coated Specimens (Bulk Specific Gravity) | 11/13/2023 | Not scheduled | IGNACIO ARECHIGA | CT D04 - Concord Field Laboratory | LOT 1 SUBLOT 17
Teichert Vernalis Drier Drum Plant
Core 1-17A=94.1%
Core 1-17 B=95.9%
All Cores PASSED | |
| 2023-10-04-71-5 | AASHTO T209-22: Standard Method of Test for Theoretical Maximum Specific Gravity (Gmm) and Density of Asphalt Mixtures (Maximum Specific Gravity) | 11/13/2023 | Not scheduled | IGNACIO ARECHIGA | CT D04 - Concord Field Laboratory | LOT 1 SUBLOT 19
Teichert Vernalis Drier Drum Plant
Theoretical Maximum Density=2.384 | |
| 2023-10-04-71-6 | AASHTO T275-07r12: Standard Method of Test for Bulk Specific Gravity (Gmb) of Compacted Asphalt Mixtures Using Paraffin-Coated Specimens (Bulk Specific Gravity) | 11/13/2023 | Not scheduled | IGNACIO ARECHIGA | CT D04 - Concord Field Laboratory | LOT 1 SUBLOT 19
Teichert Vernalis Drier Drum Plant | |
| 2023-10-04-71-7 | AASHTO T209-12: Standard Method of Test for Theoretical Maximum Specific Gravity (Gmm) and Density of Asphalt Mixtures (Maximum Specific Gravity) | 11/13/2023 | Not scheduled | IGNACIO ARECHIGA | CT D04 - Concord Field Laboratory | Teichert Vernalis Drier Drum Plant
LOT 2 SUBLOT 3
Theoretical Maximum Density=2.372
| |
| 2023-10-04-71-8 | AASHTO T275-07r12: Standard Method of Test for Bulk Specific Gravity (Gmb) of Compacted Asphalt Mixtures Using Paraffin-Coated Specimens (Bulk Specific Gravity) | 11/13/2023 | Not scheduled | IGNACIO ARECHIGA | CT D04 - Concord Field Laboratory | LOT 2 SUBLOT 3
Teichert Vernalis Drier Drum Plant
Core 2-3A=96.2%
Core 2-3B=93.9%
All cores PASSED
| |
| 2023-10-04-71-9 | AASHTO T209-22: Standard Method of Test for Theoretical Maximum Specific Gravity (Gmm) and Density of Asphalt Mixtures (Maximum Specific Gravity) | 11/13/2023 | Not scheduled | IGNACIO ARECHIGA | CT D04 - Concord Field Laboratory | LOT 2 SUBLOT 2
Teichert Vernalis Drier Drum Plant
| |
| 2023-10-04-71-10 | AASHTO T275-07r12: Standard Method of Test for Bulk Specific Gravity (Gmb) of Compacted Asphalt Mixtures Using Paraffin-Coated Specimens (Bulk Specific Gravity) | 11/13/2023 | Not scheduled | IGNACIO ARECHIGA | CT D04 - Concord Field Laboratory | LOT 2 SUBLOT 2
Teichert Vernalis Drier Drum Plant
Core 2-2A | |