Print Report | Back to Sample Detail

Sample Record for 2023-10-06-42

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 214135 DEA: 09213404 EFIS: 0900000030 QA Service Level: 1
DIST-CO-RTE-PM: 09-INY-395-29.9/41.8
Work Description: ROADWAY EXCAVATION, PLACE HMA (TYPE A), AND ALTERNATIVE PIPE CULVERT.
Location Description: INYO COUNTY NEAR OLANCHA AND CARTAGO FROM 1.4 MILES SOUTH OF LOS ANGELES AQUEDUCT BRIDGE TO 0.2 MILE SOUTH OF ASH CREEK BRIDGE
Contractor Name: FISHER SAND & GRAVEL CO.
Contractor Address: 1302 W DRIVERS WAY, TEPE, AZ. 85284
Resident Engineer: Kris Raber Structure Rep.: Sheila Reyes

Sample Information

DIME Sample ID: 2023-10-06-42
TL Number from the TL Form:
Sample Submitted By Organization: CT D09 - Bishop Field Laboratory
Sample Organization Contact: (760) 872-5211
Type of Sample: Quality Assurance
Type of Material: Concrete
Sample Taken Date: 10/06/2023
Date that the sample was received by the laboratory/organization performing the testing: 10/06/2023
The quantity of what the sample constitutes: 40 CY
A brief description of the sample: ConAggs
From where was the sample collected: Source
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: 711 Materials Ridgecrest

Material Information

The concrete mix design number: 750216A6
The truck number from where the sample was collected:
The batch plant ticket number from where the sample was collected: Concrete Plant
Concrete batch plant:
The fabricator/manufacturer designation for the sample:
A detailed description of where the material sample was collected: DS 1354 NL Olancha Creek Inlet Headwall
Where the material sample would have been placed if not sampled:
From Lot No.:
Bag Lot No.:

Test Results

Test 1 of 1

DIME Test ID: 2023-10-06-42-2
Test Method: ASTM C39-21: Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens
Verified Date: 11/03/2023
Date Tested: 11/03/2023
Submitted By Organization: CT D09 - Bishop Field Laboratory
Organization Address: 500 South Main Street,
Organization City: Bishop
Organization State: CA
Organization Zipcode: 93514
Organization Email: chris.talbot@dot.ca.gov
Organization Phone: (760) 872-0794
General Comments for this Test: Emergency Project: 09-399404 Mix NO. 750216A6 Break 3 at 28 Days
Test Result Compliance:
Additional Comments When Verified:
Unit system used? US Units
Number of specimens 3
Test performed With no density determined
Capped in accordance with? no data
Apparent mass of submerged cylinder 1 3.5 lb
Average diameter of cylinder 1 4.00 in
Average diameter of cylinder 2 4.00 in
Average diameter of cylinder 3 4.00 in
Cross sectional area of cylinder 1 12.57 in^2
Cross sectional area of cylinder 2 12.57 in^2
Cross sectional area of cylinder 3 12.57 in^2
Compressive strength (to nearest 10 psi) 3920 psi
Maximum load on cylinder 1 49425 lb
Maximum load on cylinder 2 49775 lb
Maximum load on cylinder 3 48475 lb
Compressive strength of cylinder 1 3930.0 psi
Type of fracture pattern of cylinder 1 1
Compressive strength of cylinder 2 3960.0 psi
Compressive strength of cylinder 3 3860 psi
Type of fracture pattern of cylinder 2 1
Type of fracture pattern of cylinder 3 1
Comment on any defect in either specimen or caps (Max 250 Characters) no data
Correction factor for cylinder 1 1
Correction factor for cylinder 2 1
Correction factor for cylinder 3 1
Age of specimen no data0 days
Age of specimen in hours no data0 hours
Serial number of delivery ticket, if available no data

Tests Assigned to this Sample

DIME Test IDTest MethodAssigned DateTest DateAssigned ByAssigned LabTest CommentsAssigned To
2023-10-06-42-3ASTM C39-21: Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens10/18/202311/17/2023Sheila ReyesCT D09 - Bishop Field LaboratoryEmergency Project: 09-399404 Mix NO. 750216A6 Break 3 at 42 DaysDerek Carrington
2023-10-06-42-4ASTM C39-21: Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens10/18/202312/01/2023Sheila ReyesCT D09 - Bishop Field LaboratoryEmergency Project: 09-399404 Mix NO. 750216A6 Hold 3 at 56 Day if strength isn't met at 42 day breakDerek Carrington