Sample Record for 2023-09-04-4

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 994803 DEA: 043J0704 EFIS: 0415000077 QA Service Level: 1
DIST-CO-RTE-PM: 04-CC-80-10.1/13.5
Work Description: Remove PCC and AC, place PCP and AC Resurfacing.
Location Description: Construction on State Highway in Contra Costa County in Hercules and Crockett from Route 80/4 separation to 0.1 mile west of Crockett Viaduct.
Contractor Name: VANGUARD CONSTRUCTION, INC.
Contractor Address: 651 ENTERPRISE CT, LIVERMORE, CA 94550
Resident Engineer: Ta Seng Structure Rep.: Unknown

Sample Information

DIME Sample ID: 2023-09-04-4
TL Number from the TL Form:
Sample Submitted By Organization: CT D04 - Richmond Field Laboratory
Sample Organization Contact: (510) 231-7151
Type of Sample: Quality Assurance
Type of Material: Concrete
Sample Taken Date: 09/04/2023
Date that the sample was received by the laboratory/organization performing the testing: 09/04/2023
The quantity of what the sample constitutes: Concrete Beams
A brief description of the sample: Flexural Strength on Concrete Beams
From where was the sample collected: Job Site
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Vanguard Mobile Hercules Plant

Material Information

The concrete mix design number: HE4x12BM
The truck number from where the sample was collected:
The batch plant ticket number from where the sample was collected: none
Concrete batch plant:
The fabricator/manufacturer designation for the sample:
A detailed description of where the material sample was collected: Concrete Truck
Where the material sample would have been placed if not sampled:
From Lot No.:
Bag Lot No.:

Test Results

Test 1 of 1

DIME Test ID: 2023-09-04-4-12
Test Method: CTM 524-March 2013: Method of Test for Flexural Strength Of Rapid Strength Concrete
Verified Date: 10/13/2023
Date Tested: 09/04/2023
Submitted By Organization: CT D04 - Richmond Field Laboratory
Organization Address: 3401 Regatta Boulevard,
Organization City: Richmond
Organization State: CA
Organization Zipcode: 94508
Organization Email: santiago.sequeira@dot.ca.gov
Organization Phone: (510) 385-7641
General Comments for this Test: 1-15A Vanguard Mobile Hercules Plant Beam PASSED
Test Result Compliance: complies
Additional Comments When Verified:
Number of specimens 1
Does the testing machine measure load or stress on the beam specimen? Stress
Fracture initiates in the tension surface Within the Middle Third of the Span Length
Fracture occurred at a capped section Yes
Is a beam dimensional correction factor used? Yes
Age of specimen 0 days
Modulus of rupture 400 psi

Tests Assigned to this Sample

DIME Test IDTest MethodAssigned DateTest DateAssigned ByAssigned LabTest CommentsAssigned To
2023-09-04-4-1CTM 524-March 2013: Method of Test for Flexural Strength Of Rapid Strength Concrete10/13/2023Not scheduledIGNACIO ARECHIGACT D04 - Richmond Field LaboratoryBeam Set 22 A Beams PASSED Vanguard Mobile Hercules Plant A
2023-09-04-4-2CTM 524-March 2013: Method of Test for Flexural Strength Of Rapid Strength Concrete10/13/2023Not scheduledIGNACIO ARECHIGACT D04 - Richmond Field LaboratoryBeams PASSED Beam Set 23 C Vanguard Mobile Hercules Plant C
2023-09-04-4-3CTM 524-March 2013: Method of Test for Flexural Strength Of Rapid Strength Concrete10/13/2023Not scheduledIGNACIO ARECHIGACT D04 - Richmond Field LaboratoryBeams PASSED Beam Set 28 A Vanguard Mobile Hercules Plant A
2023-09-04-4-4CTM 524-March 2013: Method of Test for Flexural Strength Of Rapid Strength Concrete10/13/2023Not scheduledIGNACIO ARECHIGACT D04 - Richmond Field LaboratoryBeams Passed Vanguard Mobile Hercules Plant Beam Set 27 B
2023-09-04-4-5CTM 524-March 2013: Method of Test for Flexural Strength Of Rapid Strength Concrete10/13/2023Not scheduledIGNACIO ARECHIGACT D04 - Richmond Field LaboratoryBeams PASSED Beam Set 26 C Vanguard Mobile Hercules Plant C
2023-09-04-4-6CTM 524-March 2013: Method of Test for Flexural Strength Of Rapid Strength Concrete10/13/2023Not scheduledIGNACIO ARECHIGACT D04 - Richmond Field LaboratoryBeams PASSED Vanguard Mobile Hercules Plant D Beam Set 25 D
2023-09-04-4-7CTM 524-March 2013: Method of Test for Flexural Strength Of Rapid Strength Concrete10/13/2023Not scheduledIGNACIO ARECHIGACT D04 - Richmond Field LaboratoryBeams PASSED Beam Set 24 A Vanguard Mobile Hercules Plant A
2023-09-04-4-8CTM 524-March 2013: Method of Test for Flexural Strength Of Rapid Strength Concrete10/13/2023Not scheduledIGNACIO ARECHIGACT D04 - Richmond Field LaboratoryBeams PASSED Beam Set 32 D Vanguard Mobile Hercules Plant D
2023-09-04-4-9CTM 524-March 2013: Method of Test for Flexural Strength Of Rapid Strength Concrete10/13/2023Not scheduledIGNACIO ARECHIGACT D04 - Richmond Field LaboratoryBeams PASSED Beam Set 31 C Vanguard Mobile Hercules Plant C
2023-09-04-4-10CTM 524-March 2013: Method of Test for Flexural Strength Of Rapid Strength Concrete10/13/2023Not scheduledIGNACIO ARECHIGACT D04 - Richmond Field LaboratoryBeams PASSED Beam Set 35 B Vanguard Mobile Hercules Plant B
2023-09-04-4-11CTM 524-March 2013: Method of Test for Flexural Strength Of Rapid Strength Concrete10/13/2023Not scheduledIGNACIO ARECHIGACT D04 - Richmond Field Laboratory1-10B Vanguard Mobile Hercules Plant B Beam FAILED