Print Report | Back to Sample Detail

Sample Record for 2023-09-21-80

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 994785 DEA: 023H32U4 EFIS: 0221000164 QA Service Level: 1
DIST-CO-RTE-PM: 02-SIS-I5-2.5/R15.9
Work Description: Roadway rehabilitation and bridge improvements along I5 in Mount Shasta
Location Description: SIS I5 2.5/R15.9
Contractor Name: Gordon Stout - Walsh/Myers
Contractor Address: 1390 Willow Pass Rd Suite 950, Concord, CA 94520
Resident Engineer: Austin Henry Structure Rep.: Mike Sears

Sample Information

DIME Sample ID: 2023-09-21-80
TL Number from the TL Form: c778604
Sample Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Sample Organization Contact: (530) 329-6527
Type of Sample: Quality Assurance
Type of Material: SMTL TM5 - Couplers
Sample Taken Date: 09/21/2023
Date that the sample was received by the laboratory/organization performing the testing: 10/10/2023
The quantity of what the sample constitutes: 4
A brief description of the sample: Dayton Superior coupler
From where was the sample collected: Manufacturer
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Comblin Steel

Material Information

Production or Authorization Testing: Production Testing
Service or Ultimate: Service
Material Standard Code: ASTM A706
Material Grade: 60
Rebar Manufacturer: Dayton Superiour
Coupler Manufacturer: Barlock
Intermediate Assembler or Fabricator:
Rebar Size: #9
Coupler Model: Bar-Lock
Coating Standards: Uncoated
Shape of Rebar: Straight
Rebar Hoop Diameter:
Rebar Hoop Fabricator:
Coupler Component Heat/Lot Number(s): 4000003595
Rebar Heat Number(s): 2310734
Rebar Size 2 :
Coupler Unique ID: SL-17-01

Test Results

Test 1 of 3

DIME Test ID: 2023-09-21-80-1
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 10/12/2023
Date Tested: 10/10/2023
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested 1
SampleNumber of CyclesSizeMfg. Lot Number(s)Slip (inch)Area (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
1No. 9/29mm10.004719029190291Service Spliceaauvinen
UTM 400kip
Temperature 72.00 f
Halo ID Small

Test 2 of 3

DIME Test ID: 2023-09-21-80-2
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 10/12/2023
Date Tested: 10/10/2023
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested 1
SampleNumber of CyclesSizeMfg. Lot Number(s)Slip (inch)Area (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
2No. 9/29mm1019241492414Service Spliceaauvinen
UTM 400kip
Temperature 72.00 f
Halo ID

Test 3 of 3

DIME Test ID: 2023-09-21-80-3
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 10/12/2023
Date Tested: 10/10/2023
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested 1
SampleNumber of CyclesSizeMfg. Lot Number(s)Slip (inch)Area (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
3No. 9/29mm1019866698666Service Spliceaauvinen
UTM 400kip
Temperature 72.00 f
Halo ID