Print Report | Back to Sample Detail

Sample Record for 2023-10-05-25

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 995087 DEA: 051P5904 EFIS: 0522000086 QA Service Level: 1
DIST-CO-RTE-PM: 05-SCR-1-0.0/5.0
Work Description: Cold plane, RHMA-G
Location Description: Watsonville area, County line to Scenic pullout
Contractor Name: A. TEICHERT & SON, INC. DBA TEICHERT CONSTRUCTION
Contractor Address: 3500 American River Dr, Sacramento CA 95864
Resident Engineer: Tyler Lavering Structure Rep.: Unknown

Sample Information

DIME Sample ID: 2023-10-05-25
TL Number from the TL Form:
Sample Submitted By Organization: CT D05 - Monterey Construction Field Laboratory
Sample Organization Contact: 831-818-0254
Type of Sample: Quality Assurance
Type of Material: Asphalt Rubber Binder
Sample Taken Date: 10/05/2023
Date that the sample was received by the laboratory/organization performing the testing: 10/08/2023
The quantity of what the sample constitutes: 2 Cans
A brief description of the sample: 64-16 ARB
From where was the sample collected: Fabricator
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: National Blending Company

Material Information

Asphalt modifier supplier: San Joaquin Refining Co Inc
Performance Grade: PG 64-16
Lot number:
Sublot number:
Asphalt Rubber Binder Mix Number: 23_1354

Test Results

Tests Assigned to this Sample

DIME Test IDTest MethodAssigned DateTest DateAssigned ByAssigned LabTest CommentsAssigned To
2023-10-05-25-1ASTM D217-16: Standard Test Methods for Cone Penetration of Lubricating Grease (Cone Penetration)10/09/2023Not scheduledWesley RiderCT D05 - Monterey Construction Field Laboratory
2023-10-05-25-2ASTM D36-14ε1: Standard Test Method for Softening Point of Bitumen (Ring-and-Ball Apparatus) (Softening Point)10/09/2023Not scheduledWesley RiderCT D05 - Monterey Construction Field Laboratory
2023-10-05-25-3ASTM D5329-16: Standard Test Methods for Sealants and Fillers, Hot-Applied, for Joints and Cracks in Asphalt Pavements and Portland Cement Concrete Pavements (Asphalt Pavement)10/09/2023Not scheduledWesley RiderCT D05 - Monterey Construction Field Laboratory